Claudia, Cintaka Septania (2020) Inventory Lot-Sizing Problem untuk Pengadaan Kantong Semen dengan Mempertimbangkan Multi-Period Scenario dan Faktor Kualitas untuk Multi-Supplier dan Multi-Product. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
02411640000137-Undergraduate_Theses.pdf Download (1MB) | Preview |
Abstract
Inventory lot-sizing problem merupakan salah satu jenis masalah dalam manajemen persediaan yang bertujuan untuk menentukan jumlah barang yang dipesan dalam memenuhi permintaan dengan tujuan meminimalkan total biaya pengadaan. Pada kasus yang terjadi pada PT. Semen Indonesia (Persero) Tbk khususnya packing plant Tuban, terdapat permasalahan pada pengadaan kantong semen dengan merek dagang Semen Gresik karena tingginya jumlah overstock maupun stockout pada masing-masing jenis kantong. Jika penanganan dalam pengadaan kantong tidak tepat, maka dapat berpengaruh langsung dalam proses distribusi semen untuk memenuhi ketersediaan semen di pasar. Biaya yang dikeluarkan pada tahun 2019 untuk pemenuhan kebutuhan kantong mencapai Rp 343,392,538,946, stok yang disimpan pada awal tiap periode yang diakibatkan penyimpanan kantong pada periode sebelumnya juga tinggi, yaitu mencapai total 17,334,128 unit per tahunnya, faktor kualitas dari masing-masing supplier kantong juga mempengaruhi ketersediaan semen karena kondisi beberapa kantong yang diterima dari supplier tidak sesuai dengan kualitas sehingga terdapat kondisi kantong yang pecah pada saat proses packing. Untuk mengatasi permasalahan tersebut, dalam penelitian ini dirancang model matematis untuk menentukan jumlah pembelian kantong untuk memenuhi permintaan dengan batasan berupa permintaan, kualitas supplier, kapasitas gudang dan kapasitas supplier. Tujuan dari perancangan model matematis adalah untuk mendapatkan total biaya pembelian, pemesanan dan penyimpanan yang paling minimum. Model matematis untuk inventory lot-sizing menggunakan model matematis mixed integer linear programming (MILP) dengan mempertimbangkan multi-period scenario dan faktor kualitas untuk multi-supplier dan multi-product. Output dari hasil model matematis memberikan penghematan sebesar Rp 4,614,855,795,- dengan jumlah penghematan terbesar pada biaya penyimpanan yaitu sebesar Rp 3,838,970,867,-.
===============================================================
Inventory lot-sizing problem is type of problems in inventory management which function to determine the number of goods ordered to meet demand with the objective to minimizing total procurement costs. In the case of PT. Semen Indonesia (Persero) Tbk particulary in Tuban packing plant, there are problems with the procurement of cement bags under the brand name Semen Gresik due to the high number of overstocks and stockouts. If the handling in the procurement of bags is not appropriate, it can directly influence the cement distribution process to meet the availability of cement in the market. Costs incurred in 2019 for the proucrement of bags reach Rp 343,392,538,946,- the stock saved at the beginning of each period due to the storage of bags in the previous period was also high, reaching a total of 17,334,128 units per year, the quality factor of bag suppliers also affects availability of cement because the condition of some bags received from the suppliers is in imperfect condition, so that there is a condition that the bag broke during the packing process. To overcome these problems, in this study a mathematical model was designed to determine the number of bags purchased to meet demand with constraints in the form of demand, supplier quality, warehouse capacity and supplier capacity. The objective of designing a mathematical model is to get the minimum total purchase costs, order costs and holding costs. The mathematical model for inventory lot-sizing uses a mixed integer linear programming (MILP) by considering multi-period scenarios and quality factor for multi-suppliers and multi-products. The output from the mathematical model results in savings of Rp 4,614,855,795,- with the largest amount of savings in holding costs of Rp 3,838,970,867,-
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Faktor Kualitas, Inventory Lot-Sizing Problem, Mixed Integer Linear Programming, Multi-Period Scenario, Optimization |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD39.5 Industrial procurement. Q Science > Q Science (General) > Q180.55.M38 Mathematical models |
Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
Depositing User: | Cintaka Septania Claudia |
Date Deposited: | 29 Aug 2020 03:11 |
Last Modified: | 02 Oct 2023 07:02 |
URI: | http://repository.its.ac.id/id/eprint/81646 |
Actions (login required)
View Item |