Estimasi Waktu Dan Biaya Pada Pelaksanaan Proyek Pembangunan Jalan Tol Pandaan-Malang Seksi 4 STA 32+000 Sampai Dengan STA 35+000

Putra, Agustian Dwi Kurnia (2020) Estimasi Waktu Dan Biaya Pada Pelaksanaan Proyek Pembangunan Jalan Tol Pandaan-Malang Seksi 4 STA 32+000 Sampai Dengan STA 35+000. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111600000050-Non_Degree.pdf]
Preview
Text
10111600000050-Non_Degree.pdf

Download (4MB) | Preview

Abstract

Jalan tol Merupakan jalan alternatif tanpa hambatan yang
bertujuan untuk mempersingkat jarak dan waktu perjalanan dari satu daerah ke daerah lainnya. Jalan tol sendiri dikhususkan kendaraaan dengan minimal 2 gandar (Truk, Mobil, Bus, dll) dan sebelum memasuki jalan tol terdapat gerbang tol untuk membayar biaya masuk ke jalan tol tersebut dengan biaya yang berbeda setiap golongannya. Kebutuhan penggunaan jalan untuk ke Pandaan - Malang secara lebih singkat, melatar belakangi dilakukannya
proyek jalan tol Pandaan - Malang ini, dengan estimasi yang singkat dengan hasil optimal, agar jalan tol Pandaan - Malang ini segera dinikmati pengguna kendaraan
Permasalahan yang terjadi pada proyek ini, yaitu waktu
yang kurang optimal dalam proyek sehingga terjadi keterlambatan dalam pengerjaan dari jadwal perencanaan, akibat dari hal tersebut pengguna jalan tol Pandaan - Malang harus diundur dari jadwal yang ditetapkan yang berpengaruh pada biaya proyek jalan tol tersebut, hasil yang diinginkan dari peninjauan kembali permasalahan ini adalah, sebagai bahan evalusai kedepannya dalam pembuatan jalan tol Pandaan - Malang jika terjadi kerusakan dengan hal - hal yang terjadi dilapangan.
=========================================================
=========================================================
Toll roads represent alternative roads without obstacles intended to shorten the distance and travel time from one area to another. The toll road itself is specialized in vehicles with a minimum of 2 axles (Trucks, Cars, Buses, etc.) and before entering the toll road a toll gate is required to pay the entrance fee to the toll road with
different fees for each class. Pandas - Pandaan - Malang road, shorter, background, pandana road, Pandaan - Malang toll road, with a short estimation with optimal results, so that the Pandaan - Malang toll road is immediately bought by vehicle users The problems that occur in this project, namely the use of heavy equipment that is less than optimal in the project so that there is a delay in the execution of the planning schedule, as a result of this Pandaan - Malang toll road users must be postponed from the specified schedule, the desired results of the review are, as evaluation materials in the future in the construction of the Pandaan - Malang toll road in the event of damage to things that occur in the field.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Jalan tol Pandaan - Malang, perencanaan, penjadwalan , rencana anggaran biaya, Pandaan - Malang toll road, planning, scheduling, budget planning
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Agustian Dwi Kurnia Putra
Date Deposited: 11 Sep 2020 02:08
Last Modified: 09 Jan 2024 07:37
URI: http://repository.its.ac.id/id/eprint/81761

Actions (login required)

View Item View Item