Evaluasi Kinerja Bundaran Mulyosari Menjadi Simpang Bersinyal

Novelita, Fiany Dara and Listiari, Endah Tri (2016) Evaluasi Kinerja Bundaran Mulyosari Menjadi Simpang Bersinyal. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113030100-3113030103-Non_Degree_Thesis.pdf]
Preview
Text
3113030100-3113030103-Non_Degree_Thesis.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Pembangunan pada suatu lokasi, baik pembangunan
gedung perkantoran, gedung tinggal, maupun gedung sekolah
pasti akan menimbulkan dampak dan pengaruh terhadap arus lalu
lintas yang ada disekitarnya. Maka perlu adanya tinjauan ulang
atau evaluasi terhadap prasarana transportasi sebagai penunjang
mobilisasi masyarakat. Bundaran Mulyosari menjadi penghubung
dari daerah pemukiman Mulyosari, area kampus Institut
Teknologi Sepuluh Nopember, pusat perbelanjaan East Coast ,
komplek perumahan Pakuwon City, serta yang sedang dalam
tahap rencana pembangunan yaitu Apartemen Grand
Dharmahusada Laagoon. Dapat dianalisa bahwa nantinya akan
terjadi peningkatan volume kendaraan pada bundaran tersebut
dalam waktu yang cukup singkat. Sehingga kondisi eksisting
bundaran Mulyosari perlu dilakukan evaluasi hingga tahun
berapakah kinerja bundaran terrsebut dapat dipertahankan.
Data yang dibutuhkan meliputi data primer yang
meliputi data geometrik, data arus lalu-lintas, data kondisi
lingkungan. Dan data sekunder yang meliputi peta lokasi, data
jumlah penduduk, dan data pertumbuhan kendaraan bermotor
kota Surabaya yang didapatkan dari Badan Perencanaan Pembangunan Kota (BAPPEKO), Dinas Perhubungan Kota
Surabaya, dan Badan Pusat Statistik Kota Surabaya. Selanjutnya
dianalisis sesuai dengan metode yang ada pada MKJI 1997
dengan bantuan program KAJI untuk menghitung volume pada
kondisi eksisting.
Dari hasil evaluasi kinerja bundaran akan didapatkan
hasil yaitu kapasitas, derajat kejenuhan, tundaan, dan peluang
antrian bundaran. Pada tahun 2017 didapatkan DS > 0,75 pada
salah satu bagian jalinan bundaran, sehingga dilakukan perubahan
kinerja menjadi simpang bersinyal. Dengan menggunakan
perhitungan 3 fase, didapatkan DS > 0,75 pada semua pedekat
dan Level of Service (LOS) simpang adalah C. Dari hasil evaluasi
rencana perbaikan didapatkan LOS D pada tahun 2019-2021, dan
pada tahun 2022 didapatkan LOS E
==================================================================================================================
The development on a site, whether development of office
buildings, houses, or even school buildings would certainly have
an impact and influence on the traffic flow around the site.
Therefore, transportation infrastucture as supporting comunity
mobilization needs to be reviewed and evaluated. Mulyosari
roundabout is a connector from residential area in Mulyosari,
Institute Technology of Sepuluh Nopember area, East Cost
shopping area, Pakuwon City residential area, and currently
under development plan that is Grand Dharmahusada Lagoon
Apartment. Those, it can be analyzed that there will be an
increasing of vehicle volume at Mulyosari roundabout in a short
time. So, Mulyosari roundabout condition in nowadays need to be
evaluated up to what year roundabout performance can be
maintened.
Data required includes primary data such as geometric
data, traffic flow, and land use data. And secondary data
including location maps, inhabitant population data, and vehicle
growth data in Surabaya obtained from Badan PerencanaanPembangunan Kota (BAPPEKO), Dinas Perhubungan (Dishub)
Kota Surabaya, and Badan Pusat Statistika (BPS) Kota
Surabaya. Then it will be analyzed according to MKJI 1997 with
KAJI software for calculate the volume of the existing condition.
From the result of roundabout performance evaluation can
be found capacity, degree of saturation (DS), delays, and queue
probability. In 2017 obtained DS > 0,75 on the one of weaving
section of roundabout, so there will be a change in performance
into signalized intersection. By using 3 phase, obtained DS > 0,75
in all of the approachment and Level Of Service (LOS)
intersection is C. From the evaluation result obained LOS D in
2019 – 2021, in 2022 obtained LOS E.

Item Type: Thesis (Diploma)
Additional Information: RSS 388.413 12 Nov e
Uncontrolled Keywords: Bundaran, MKJI 1997, KAJI, Simpang bersinyal
Subjects: H Social Sciences > HE Transportation and Communications > HE355 Traffic engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: ansi aflacha
Date Deposited: 16 Sep 2020 04:03
Last Modified: 16 Sep 2020 04:03
URI: http://repository.its.ac.id/id/eprint/81948

Actions (login required)

View Item View Item