Berbagai upaya pemenuhan kondisi sanitasi di upayakan
terus meningkat. Hal ini memicu timbul nya inovasi dalam
peningkatan kualitas sistem distribusi air minum. Zona air minum
prima (ZAMP) merupakan salahsatu bentuk inofasi dalam
meningkatkan kualitas menjadi air yang bisa langsung di minum
tanpa harus di masak terlebih dahulu. Dalam hal ini PDAM Kota
Malang telah membuat daerah yag telah dilayani ZAMP sebagai
model atau percontohan.
Data yang di gunakan dalam perencanaan ini terdiri dari
data primer dan data sekunder. Dimana untuk pengolahan
jaringan menggunakan program EPANET. Untuk data kontur
lahan didapatkan melalui survey lapangan dengan GPS.Sistem
Distribusi Air siap minum ini di pecah dari satu zona menjadi
beberapa Distrik Meter Area (DMA) untuk mempermudah dalam
melakukan analisa kebocoran. DMA ini merupakan system yang
benar-benar terisolasi sehingga tidak dipengaruhi kondisi pada
DMA lainnya. Penjagaan kualitas air siap minum ini dilakukan
dengan pemantauan terhadap sisa chlor dan pembersihan yang
terjadual secara rutin di setiap DMA. Apabila terdapat pipa yang
melewati batas DMA harus dilakukan isolasi mengginakan Blind
Flange.
Dari hasil analisa menggunakan program EPANET sistem
DMA yang direncanakan masih memenuhi parameter minimum
sisa chlor sebesar 0.2 mg/l. Agar penambahan DMA tidak
mengganggu sistem yang sudah ada, maka diperlukan
penggantian sebagian pipa primer
==============================================================================================
Various efforts to comply with the sanitary conditions at
strived constantly increasing. This triggers its innovation arises in
improving the quality of drinking water distribution systems.
Zona Air Minum Prima (ZAMP) is one of the main forms of
inofasi in improving the quality of water that can be directly in
the drink without having to cook it first. In this case PDAM
Malang has made the area ZAMP Yag has served as a model or
pilot.
Data used in this plan consists of primary data and
secondary data. Where to processing network using EPANET
program. For land contour data obtained through field surveys
with GPS.Drinkable water distribution system is split into several
zones of the District Meter Areas (DMA) to facilitate the analysis
of leakage. DMA is a system that is completely isolated so not
affected by the condition in the other DMA. Guard the quality of
potable water is done by monitoring the residual chlorine and
cleaning regularly scheduled in each DMA. If there is a pipe that
crosses the line must be isolated mengginakan DMA Blind
Flange.
From the analysis using EPANET program planned DMA
system still meets the minimum parameters chlorine residual of
0.2 mg / l. In order for the addition of DMA does not interfere
with the existing system, it would require the replacement of most
of the primary pipes
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSL 628.168 Has p |
Uncontrolled Keywords: | Air Minum, DMA, EPANET ,PDAM |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD233 Water consumption T Technology > TD Environmental technology. Sanitary engineering > TD259.2 Drinking water. Water quality |
Divisions: | Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis |
Depositing User: | EKO BUDI RAHARJO |
Date Deposited: | 05 Oct 2020 05:34 |
Last Modified: | 05 Oct 2020 05:34 |
URI: | http://repository.its.ac.id/id/eprint/82071 |
Actions (login required)
View Item |