Pada pekerjaan struktur plat lantai bangunan gedung
bertingkat seiring kemajuan teknologi telah mengalami
perkembangan dari segi metode, peralatan, maupun materialnya.
Salah satunya adalah penggunaan halfslab untuk bekisting. Pada
cara komposit bondek, untuk pengerjaan struktur pelat lantai
digunakan bondek sebagai bekisting buang dan jika
menggunakan halfslab, bekisting buang yang digunakan adalah
beton pracetak. Kedua metode ini menggunakan plat
konvensional untuk menjadikan struktur lantai tersebut komposit.
Data analisa yang diperlukan untuk perbandingan dua
sistem ini adalah data sekunder. Data sekunder adalah data yang
diperoleh dari pihak pelaksana pekerjaan yaitu berupa gambar
modul halfslab, time schedule, perhitungan struktur halfslab, dan
volume bekisting halfslab. Perhitungan waktu didasarkan pada
pembagian volume pekerjaan dengan tingkat produktivitas
sumber daya dan jumlah group yang melaksanakan pekerjaan
tersebut, sedangkan perhitungan biaya berdasarkan jumlah

volume pekerjaan dan jumlah kebutuhan material pada masing-
masing pekerjaan.

Dari hasil perhitungan terhadap biaya dan waktu proyek
pembangunan Apartement De Papilio Tamansari Surabaya
dengan menggunakan metode halfslab, waktu pelaksanaan yang
diperlukan adalah 205 hari dengan biaya Rp 15.342.599.781,12
dan untuk metode plat komposit bondek membutuhkan waktu
pelaksanaan selama 176 hari dengan biaya pelaksanaannya
sebesar Rp 10.698.498.238,00. Metode plat komposit bondek
lebih murah dibandingkan metode halfslab dalam
pelaksanaannya, dan waktu yang dibutuhkan plat komposit
bondek lebih cepat daripada halfslab.
============================================================================================================
At slab structure works of story buildings as technology
advances has been progressing in terms of methods, equipment,
and material. One is the use of halfslab for formwork. In
composite bondek way, for the working structure of the floor
slabs are used as formwork bondek waste and if using halfslab,
waste formwork used is precast concrete. Both of these methods
use a conventional plate to make the composite floor structure.
The data necessary for comparative analysis of these two
systems is secondary data. Secondary data is data obtained from
executing the work in the form of images halfslab modules, time
schedule, halfslab structure calculations, and the halfslab
formwork volume. The calculation time is based on the division of
work volume to the productivity of resources and the number of
groups that carry out such work, while the cost calculation is
based on the amount of volume of work and the amount of
material on the needs of each job.
From the calculation of the costs and the time at
construction project of Apartement De Papilio Tamansari
Surabaya which a method halfslab, total duration of the project
required for this method is 205 days at a cost of Rp
15.342.599.781,12 and for the composite plate method bondek
implementation takes over 176 days at a cost of Rp
10.698.498.238,00. Composite bondek method more cheap than halfslab in practice, and the time required to composite bondek
faster than halfslab.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 692.5 Fas a 3100014056238
Uncontrolled Keywords: halfslab, plat komposit bondek, metode plat lantai.
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Yeni Anita Gonti
Date Deposited: 12 Oct 2020 02:39
Last Modified: 12 Oct 2020 02:39
URI: http://repository.its.ac.id/id/eprint/82107

Actions (login required)

View Item View Item