Haji, Muhammad Arif Bayu and Murtadha, Faiz (2021) Laporan Kerja Praktek 1 Juni-1 Agustus 2019 DI LRT Jabodetabek PT Adhi Karya. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
03111640000111_03111640000140-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (5MB) | Request a copy |
Abstract
Kegiatan Kerja Praktek bertempat di LRT JABODEBEK lintas Cawang-Dukuh Atas pada bagian LongSpan Kuningan. proses yang diamati diantaranya pengecoran, stressing, dan metode penggunaan box girder.
=====================================================================================================
Project work activities are located at the JABODEBEK LRT crossing Cawang-Dukuh Atas in the LongSpan Kuningan section. The processes observed were casting, stressing, and box girder usage methods.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | pengecoran, stressing, dan metode penggunaan box girder. |
Subjects: | T Technology > TF Railroad engineering and operation > TF1327.O58 High speed ground transportation (train) T Technology > TG Bridge engineering > TG362 Box girder bridges--Design and construction. |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Faiz Murtadha |
Date Deposited: | 21 Jan 2021 00:25 |
Last Modified: | 04 Apr 2023 03:44 |
URI: | http://repository.its.ac.id/id/eprint/82549 |