Laporan Kerja Praktik 29 Juni 2020 - 29 Agustus 2020 di PT. Wijaya Karya Bangunan Gedung (Persero) Tbk pada Proyek Pembangunan Apartemen Tamansari Prospero Tower Beatus

Alghiffary, Rizqi and Muqodar, Agung (2020) Laporan Kerja Praktik 29 Juni 2020 - 29 Agustus 2020 di PT. Wijaya Karya Bangunan Gedung (Persero) Tbk pada Proyek Pembangunan Apartemen Tamansari Prospero Tower Beatus. Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111740000005_03111740000006-Project_Report.pdf]
Preview
Text
03111740000005_03111740000006-Project_Report.pdf - Accepted Version

Download (4MB) | Preview

Abstract

Pekerjaan proyek saat kegiatan kerja praktik dimulai adalah pekerjaan struktur atas lantai 5 dan pekerjaan proyek saat kerja praktik selesai adalah pekerjaan struktur atas lantai 17. Dimana pekerjaan tersebut meliputi Pekerjaan pembetonan kolom, balok, pelat, tangga, dan shearwall tiap lantainya, serta pemasangan tower crane. Proyek apartement Tamansari Prospero Tower Beatus merupakan salah satu proyek pembangunan dari 3 tower apartemen lain. Owner dari proyek ini adalah KSO WIKA GEDUNG - KAHURIPAN NIRWANA. Tower Beatus memiliki nilai kontrak Rp. 106.500.000.000. Direncanakan proyek akan selesai dalam 570 hari kalender dengan masa pemeliharaan 180 hari kalender. Tower Beatus memiliki luas bangunan ± 23.258 m2 dan 27 lantai dengan lantai atap, serta tinggi total bangunan 145 m.
=====================================================================================================
The project when the practical activity starts is to begin with the superstructure of the 5th floor and the project when the practice is completed is the structural work on the 17th floor. Where the work includes concrete work for columns, beams, plates, stairs, and shearwall for each floor, as well as the installation of tower cranes. The Tamansari Prospero Tower Beatus apartment project is one of the development projects of 3 other apartment towers. The owner of this project is KSO WIKA GEDUNG - KAHURIPAN NIRWANA. Tower Beatus has a contract value of Rp. 106,500,000,000. It is planned that the project will be completed in 570 calendar days with a maintenance period of 180 calendar days. Beatus Tower has a building area of ± 23,258 m2 and 27 floors with a roof floor, and a total building height of 145 m.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Tamansari Prospero, kolom, balok, plat
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD1391 Apartment houses
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Agung Muqodar
Date Deposited: 27 Jan 2021 01:41
Last Modified: 04 Apr 2023 05:33
URI: http://repository.its.ac.id/id/eprint/82582