Wicaksono, Aryo Bimo and Suprihana, Sallas Putri Hutami (2021) Pengamatan Metode Pelaksanaan Pile Continuous Beam (PCB) di Proyek Pembangunan Jalan Tol Serang-Panimbang STA 17+345 - STA 18+125. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
03111740000009_03111740000144-Project_Report.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (35MB) | Request a copy |
Abstract
Pada saat ini, pemerintah Indonesia sedang giat-giatnya melakukan pembangunan terhadap infrastruktur, bangunan, dan lain-lain. Pembangunan infrastruktur dilakukan agar sarana masyarakat terpenuhi dan meningkatkan pemerataan pembangunan di Indonesia. Salah satu dari berbagai infrastruktur yang dibangun oleh pemerintah adalah jalan tol. Pembangunan jalan tol bertujuan untuk mempercepat jalannya perekonomian dengan membuat jalan bebas hambatan. Pada pelaksanaan kerja praktek ini, meninjau pembangunan Jalan Tol Serang-Panimbang yang menghubungkan antara tol Tangerang-Merak dengan Tanjung Lesung, Banten. Dalam pembangunan Jalan Tol ini terdapat berbagai bidang yang dapat diamati, seperti struktural, transportasi, hidrologi, dan geoteknikal. Dalam laporan, membahas tentang pembangunan Pile Continuous Beam, sebagai penanganan untuk daerah dengan tanah dasar yang dalam. Dalam pembangunannya, ditemukan berbagai kendala, namun dapat teratasi dengan berbagai inovasi yang baik.
======================================================================================================
Currently, the Indonesian government is actively developing infrastructure, buildings, and others. Infrastructure development is carried out so that community facilities are able to use and infrastructure development distributed well in Indonesia. One of the various infrastructures built by the government is a toll road. The construction of toll roads aims to accelerate the running of the economy by making expressways. In the implementation of this practical work, observing the construction of the Serang-Panimbang Toll Road that connects the Tangerang-Merak toll road with Tanjung Lesung, Banten. In the construction of this Toll Road, there are various fields that can be observed, such as structural, transportation, hydrology, and geotechnical. In the report, discusses the construction of Pile Continuous Beam, as a treatment for areas with deep bedrock. In its development, various obstacles were found, but they can be overcome with some good innovations.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Pile Continuous Beam, Expansion Joint, Flexible Pavement, Deck Slab |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA780 Piles and pile-driving T Technology > TE Highway engineering. Roads and pavements > TE175 Road and highway design |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Aryo Bimo Wicaksono |
Date Deposited: | 08 Feb 2021 02:29 |
Last Modified: | 04 Apr 2023 05:53 |
URI: | http://repository.its.ac.id/id/eprint/82607 |
Actions (login required)
View Item |