Digitalization and Standardization of Dry Docking in Replating of Ship KM. Cengkeh 02

Kurniawan, Brilliando (2021) Digitalization and Standardization of Dry Docking in Replating of Ship KM. Cengkeh 02. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211741000016-Undergraduate_Thesis.pdf]
Preview
Text
04211741000016-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Dry-Docking adalah proses docking kapal secara berkala yang dilakukan terutama karena sifat kapal yang sangat khusus dimana kapal beroperasi di sekitar air. Dry docking dianggap sebagai proses yang mahal yang membutuhkan perencanaan yang sistematis dan efisien serta estimasi biaya untuk meminimalkan biaya overhead bersama dengan pengeluaran lain yang tidak perlu. Tujuan dari penelitian ini adalah untuk meminimalkan biaya dry docking dan membuatnya efisien. Salah satu proses dry docking adalah replating kapal. Untuk meminimalisir kerugian pada galangan kapal dalam proses replating, maka diperlukan estimasi material yang dibutuhkan, biaya, dan perencanaan jam kerja agar tidak terjadi hal yang tidak diinginkan pada perusahaan galangan kapal, seperti penambahan jam kerja dan penggunaan material yang berlebihan. Dari hasil penelitian dapat disimpulkan bahwa jumlah material yang dibutuhkan untuk proses replating adalah 4055.57 Kg, total jam kerja 1344,02 JO. Untuk kebutuhan biaya material Rp. 81.111.400, - dan biaya tenaga kerja sebesar Rp. 20.277.850, -. Sehingga total biaya kegiatan replating adalah Rp. 101.389.250, -.

=====================================================================================================

Dry-Docking is a regular, periodic overhauling process founded primarily because of the very special nature of ship’s environment which is under water operations. Dry docking is considered as an expensive process which requires systematic and efficient planning and cost estimation to minimize overhead costs along with other unnecessary spending. The purpose of this research is to minimize the dry docking cost and make it efficient. One of the process of dry docking is ship replating. To minimized losses on the shipyard in replating process, it requires the estimation of materials needed, cost, and planning of man hours so that no undesirable things happen to the shipyard company, such as the addition of work hours and excessive use of materials. From the research it can be concluded that the total materials needed for replating process are 4055.57 Kg, the total man hours are 1344.02 JO. For the cost material requirements of Rp81,111,400, - and labor costs as much as Rp20,277,850, -. So that the total of the total cost of activities are Rp101,389,250, -.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Dry docking, materials needed, replating cost, man hours, Dry docking, material yang dibutuhkan, biaya replating, jam kerja
Subjects: V Naval Science > VK > VK361 Mooring of ships. Dry docks
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Brilliando Kurniawan
Date Deposited: 07 Mar 2021 21:20
Last Modified: 25 Jul 2024 03:17
URI: http://repository.its.ac.id/id/eprint/83718

Actions (login required)

View Item View Item