Perhitungan Waktu dan Biaya Pelaksanaan Struktur pada Apartemen Cornell Citraland Surabaya

Berlian, Oktavia Putri (2021) Perhitungan Waktu dan Biaya Pelaksanaan Struktur pada Apartemen Cornell Citraland Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910015004-Undergraduate_Thesis.pdf] Text
10111910015004-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (7MB) | Request a copy

Abstract

Proyek Pembangunan Apartemen Cornell berlokasi di Kawasan Citraland, Made, Sambikerep, Surabaya. Luas lahan dari proyek ini ±1490 m2 dan luas bangunan ±5778 m2. Proyek ini terdiri atas 32 lantai dan 1 basement. Struktur bawah menggunakan pondasi tiang pancang dan struktur atas menggunakan beton bertulang.
Pada Proyek Akhir ini menggunakan 2 jenis bekisting, yaitu bekisting konvensional dan bekisting alumunium. Perhitungan waktu dan biaya dihitung berdasarkan metode pelaksanaan yang sesuai dengan teori dari berbagai referensi yang digunakan. Tujuan dari penyusunan Proyek Akhir ini adalah untuk mendapatkan titik optimal hubungan antara waktu dengan biaya proyek. Untuk penjadwalan tiap item pekerjaan dilakukan dengan menggunakan bantuan aplikasi Ms. Project. Hasil akhir yang diperoleh yaitu metode pelaksanaan, durasi, rencana anggaran pelaksanaan dan kurva S.
Berdasarkan Analisa didapatkan durasi 261 hari kerja dengan anggaran biaya pelaksanaan sebesar Rp. 20.769.723.924.

==================================================================================================

The Cornell Apartment Development Project is located in the Citraland Area, Made, Sambikerep, Surabaya. The land area of this project is ± 1490 m2 and the building area is ± 5778 m2. This project consists of 32 floors and 1 basement. The lower structure uses a pile foundation and the upper structure uses reinforced concrete.
This final project uses 2 types of formwork, namely conventional formwork and aluminum formwork. Time and cost calculations are calculated based on the method of implementation in accordance with the theory of the various references used. The purpose of preparing this Final Project is to get the optimal point of the relationship between time and project costs. For scheduling each work item is done using the help of Ms. application. Project. The final results obtained are the implementation method, duration, implementation budget plan and S curve.
Based on the analysis, it is found that the duration is 261 working days with an implementation cost budget of Rp. 20,769,723,924.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kata kunci : Waktu , Biaya Pelaksanaan, Penjadwalan, Kurva S. Keyword : Cost, Time of work, Scedulling and S curve
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Oktavia Putri Berlian
Date Deposited: 08 Mar 2021 02:16
Last Modified: 08 Mar 2021 02:16
URI: http://repository.its.ac.id/id/eprint/83727

Actions (login required)

View Item View Item