Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Gedung Kantor Terpadu Kabupaten Sukoharjo Menggunakan Pelat Pracetak

Zulfahmi, Farras (2021) Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Gedung Kantor Terpadu Kabupaten Sukoharjo Menggunakan Pelat Pracetak. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910015016-Undergraduate_Thesis.pdf] Text
10111910015016-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (30MB) | Request a copy

Abstract

Proyek pembangunan gedung kantor terpadu Kabupaten Sukoharjo terletak di Gabusan, Jombor, Kecamatan Bendosari, Kabupaten Sukoharjo, proyek pembangunan gedung ini dikerjakan oleh PT. PP Urban yang dimana bangunan ini memiliki 14 lantai menggunakan atap rangka baja. Gedung ini terbuat dari rangka beton, dengan luas lahannya ± 11169 m2 dan luas bangunannya ± 6550 m2.
Berdasarkan metode pelaksanaan pada pembangunan proyek ini seluruh elemen strukturnya menggunakan metode beton cor konvensional (in situ). Metode konvensional pada umumnya membutuhkan waktu yang lebih lama, menurut Affandi (2004) kekurangan dalam metode konvensional karena masing-masing elemen struktur yang saling ketergantungan harus dikerjakan secara berurutan, mutu kurang terjamin, terutama permukaan betonnya tidak sehalus beton precast, membutuhkan banyak bekisting dan pekerja, tergantung cuaca, sangat tergantung keahlian pelaksana, sehingga dilakukan alternatif metode konstruksi berupa pelat pracetak, kelebihan pracetak dibanding sistem konvensional yaitu memiliki keunggulan lebih ekonomis dalam penggunaan bekisting, mutu lebih terjamin karena dikerjakan di pabrik dengan pengawasan yang baik, tidak terlalu terpengaruh kondisi cuaca, produktivitas lebih tinggi.
Dalam penyusunan proyek akhir ini membahas tentang perhitungan waktu dan biaya pelaksanaan proyek pembangunan gedung kantor terpadu kabupaten sukoharjo mulai dari lantai 1 sampai dengan lantai 14 sudah termasuk atap pada pekerjaan struktur dengan menggunakan metode pelat pracetak. Perhitungan waktu dan biaya pada proyek ini dimulai dengan menyusun item pekerjaan, menghitung volume, menentukan metode pelaksanaan, menghitung produktivitas dan alat berat, menghitung durasi pekerjaan, menghitung rencana anggaran pelaksanaan (RAP) menyusun bar chart dan kurva S. Hasil akhir pada proyek akhir ini adalah rekapitulasi biaya pelaksanaan proyek, metode pelaksanaan yang digunakan, durasi pekerjaan dan penjadwalan.
Hasil dari proyek akhir ini adalah durasi pelaksanaan proyek, rekapitulasi biaya, metode pelaksanaan yang digunakan, serta kurva S.
Dari hasil analisa, didapatkan durasi pekerjaan selama 279 hari kerja dengan biaya pelaksanaan sebesar Rp 40.075.615.479,-
====================================================================================================

The Integrated Office Building Construction Project for Sukoharjo Regency is located in Gabusan, Jombor, Bendosari District, Sukoharjo Regency. This building construction project was carried out by PT. PP Urban where this building has 14 floors using a steel frame roof. This building is made of concrete frame, with an area of ± 11169 m2 and a building area of ± 6550 m2
Based on the implementation method for the construction of this project, all structural elements use the conventional cast concrete method (in situ). The conventional method generally requires a longer time, according to Affandi (2004). It lacks in conventional methods because each interdependent structural element must be worked on sequentially, the quality is not guaranteed, especially the concrete surface is not as smooth as precast concrete, requires a lot of formwork and workers. depending on the weather, it really depends on the expertise of the executor, so that an alternative construction method is carried out in the form of precast plates, the advantages of precast compared to conventional systems, namely having a more economical advantage in using formwork, the quality is more guaranteed because it is done in a factory with good supervision, is not too affected by weather conditions higher productivity.
In the preparation of this final project discusses the calculation of the time and cost of implementing the integrated office building construction project in Sukoharjo regency starting from the 1st floor to the 14th floor including the roof on structural work using the precast plate method. The calculation of time and costs in this project begins with compiling work items, calculating volume, determining implementation methods, calculating productivity and heavy equipment, calculating work duration, calculating the implementation budget plan (RAP), bar charts and S curves. The final result of this final project is a recapitulation of project implementation costs, implementation methods used, work duration and scheduling.
Final result of this final project is duration of project implementation, recapitulation of costs, implementation method used, and S curve.
From the analysis, it was found that the work duration was 279 working days with an implementation cost of Rp 40,075,615,479.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pelat pracetak, metode pelaksanaan, rencana anggaran pelaksanaan (RAP), kurva S, Precast slab, implementation method, implementation budget plan (RAP), curve S.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Farras Zulfahmi
Date Deposited: 09 Mar 2021 02:17
Last Modified: 09 Mar 2021 02:17
URI: http://repository.its.ac.id/id/eprint/83740

Actions (login required)

View Item View Item