Rencana Perhitungan Waktu, Biaya Dan Pelaksanaan Pembangunan Struktur Gedung Sma, 8 Lantai Di Surabaya

Afandy, Muhammad Nur (2021) Rencana Perhitungan Waktu, Biaya Dan Pelaksanaan Pembangunan Struktur Gedung Sma, 8 Lantai Di Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910015006-Undergraduate_Thesis.pdf] Text
10111910015006-Undergraduate_Thesis.pdf
Restricted to Repository staff only until 1 April 2023.

Download (18MB) | Request a copy

Abstract

Penyusunan tugas akhir terapan yang berjudul rencana perhitungan waktu, biaya dan pelaksanaan pembangunan struktur gedung SMA, 8 lantai di Surabaya, yang ditinjau pada tugas akhir ini adalah strukur lantai 1-8, dan tidak memperhitungkan arsitekturnya.
Recana perhitungan waktu dan biaya pelaksanaan dihitung berdasarkan metode pelaksanaan yang sesuai dengan teori dan ilmu dari berbagai referensi yang telah disebutkan dalam kepustakaan serta dikaitkan dengan kondisi riil lapangan. Sehingga dengan metode pelaksanaan yang tepat maka dihasilkan waktu dan biaya yang efektif. Sedangkan untuk penyusunan jadwal tiap item pekerjaan dilakukan dengan menggunakan bantuan software Microsoftt Project dan Kurva S.
Hasil perhitungan durasi pembangungan Gedung SMA 8 lantai di Surabaya dapat diselesaikan dengan waktu 228 hari kerja dan biaya yang didapat dari hasil perhitunga adalah sebesar Rp. 26,737,297,236.71
===================================================================================================
The Preparation of this applied final project with title Duration, Cost Structural and Construction Planning Of 8Th Floor High School Building In Surabaya, that reviewed on this final project is the structure of 1-8 storey building, and does not calculate the architecture side.
The scheme of this calculation implementation of time and costs is calculated based on the method of implementation that compatible with the theory and science of various references that have been mentioned in the literature and linked to the real conditions in the field. So, with the right implementation method it will produce time and cost effectively. Meanwhile, the preparation of the schedule for each work item is carried out using the help of Microsoftt Project software and the S Curve.
The results of the duration calculation structure on the construction of the 8 storey building in Surabaya can be finished in 228 working days and will cost Rp. 26,737,297,236.71

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Waktu dan biaya pelaksanaan, penjadwalan, kurva S ================================================================================ Duration and Cost Implementation,Schedule Planning, S - Curve
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Muhammad Nur Afandy
Date Deposited: 11 Mar 2021 02:09
Last Modified: 11 Mar 2021 02:09
URI: http://repository.its.ac.id/id/eprint/84102