Prayoto, Melathi Juliya Putri (2021) Perencanaan Pembangkit Listrik Tenaga Air pada Bendungan Fila Tukutaha Desa Morba Kabupaten Alor Nusa Tenggara Timur. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
03111740000090-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (4MB) | Request a copy |
Abstract
Seiring dengan semakin bertambahnya jumlah penduduk, semakin meningkat pula kebutuhan energi listrik di Indonesia. Sehingga, diperlukan adanya upaya untuk mencegah terjadinya kekurangan energi listrik di masa mendatang. Indonesia memiliki potensi sumber daya terbarukan yang sangat melimpah, yaitu air. Air memiliki energi yang dapat dimanfaatkan sebagai pembangkit listrik. Air dapat menyimpan energi kinetik dan energi potensial. Kedua energi tersebut dapat diubah dan dimanfaatkan untuk pembangkit listrik. Salah satu daerah di Indonesia yang memiliki potensi sumber daya air yaitu terdapat pada Bendungan Fila Tukutaha. Bendungan Fila Tukutaha terletak di aliran sungai Kikilai dan masuk wilayah Desa Morba, Kecamatan Alor Barat Daya, Kabupaten Alor, Provinsi Nusa Tenggara Timur. Dengan adanya Bendungan Fila Tukutaha tersebut, terdapat potensi debit dan energi potensial yang dapat dimanfaatkan untuk PLTA.
Untuk proses perencanaan PLTA ini dimulai dengan melakukan studi literatur dan pengumpulan data yang kemudian akan diolah sehingga menghasilkan suatu desain PLTA. Data yang dipakai dalam perencanaan ini yaitu data debit irigasi dan peta topografi lokasi. Pengolahan data pertama yaitu data irigasi yang kemudian ditentukan debit andalan dengan menggunakan metode FDC (Flow Duration Curve). Setelah itu, dilakukan perhitungan perencanaan komponen-komponen pada PLTA, perencanaan dihitung sedemikian rupa sehingga memenuhi segala persyaratan yang ada. Jika dibangun PLTA di bendungan ini, diharapkan akan memberikan tambahan pasokan listrik untuk masyarakat sekitar.
Hasil dari analisa yang dilakukan, didapatkan nilai debit andalan 0,421 m3/detik dengan probabilitas 80%. Dengan menggunakan turbin 2-cell crossflow dan tinggi efektif 27,73 meter, debit tersebut mampu menghasilkan energi listrik sebesar 768.538,821 kWh selama satu tahun.
=====================================================================================================
The increasing population causes the need for electrical energy in Indonesia to increase. So that effort is needed to prevent shortages of electrical energy in the future. Indonesia has abundant potential for renewable resources, one of which is water. Water has energy that can be used to generate electricity. Water can store kinetic energy and potential energy. Both of these energies can be converted and utilized for power generation. One of the areas in Indonesia that has potential for water resources is the Fila Tukutaha Dam. Fila Tukutaha Dam is located on the Kikilai River and is part of the Morba Village area, Southwest Alor District, Alor Regency, East Nusa Tenggara Province. With the existence of the Fila Tukutaha Dam, there is potential for discharge and energy that can be utilized for hydropower.
The hydropower planning process begins with conducting a literature study and data collection. Then it is processed to get a hydropower design. The data used in this planning are irrigation discharge data and topographic maps. The first data processing is irrigation data to obtain dependable flow using the FDC (Flow Duration Curve) method. After that, calculate the planning of the components in the hydropower plant. Planning is calculated in such a way that it satisfies all requirements. If a hydroelectric power plant is built on this dam, it is expected to provide additional electricity for the surrounding community.
From the analysis, the dependable flow value is 0.421 m3/second with a probability of 80%. By using a 2-cell crossflow turbine and an effective height of 27.73 meters, the discharge can generate electrical energy of 768,538,821 kWh for one year.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | PLTA, Bendungan, Tinggi Jatuh, Energi Listrik, Hydropower, Dams, Head, Electrical Energy. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1519.S68 Hydroelectric power plants |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Melathi Juliya Putri Prayoto |
Date Deposited: | 06 Aug 2021 03:36 |
Last Modified: | 06 Aug 2021 03:36 |
URI: | http://repository.its.ac.id/id/eprint/85004 |
Actions (login required)
View Item |