Abstract

Pembangkit Listrik Tenaga Surya (PLTS) merupakan sebuah terobosan yang mampu mendukung Kebijakan Energi Nasional (KEN) yang ingin mewujudkan proporsi energi terbarukan sebesar 23% pada tahun 2025. Penggunaan PLTS sekarang banyak diaplikasikan dalam setiap aspek kehidupan pada bangunan pribadi maupun komersil. RS Soewandhie merupakan salah satu konsumen yang berencana menggunakan PLTS untuk mensuplai sebagian kebutuhan energi listrik hariannya. Pada pengimplementasiannya, PLTS memiliki keterbatasan yaitu besar energi yang dihasilkan memiliki nilai yang fluktuatif. Hal ini dikarenakan PLTS sangat bergantung pada intensitas cahaya yang dipancarkan oleh matahari. Namun, profil beban pada RS Soewandhie relatif konstan selama 24 jam sehingga pada siang hari energi yang dihasilkan oleh PLTS dapat langsung diserap oleh beban. Maka dari itu dibutuhkan sebuah desain yang tepat agar PLTS tersebut mampu menyuplai energi listrik secara maksimal, mengurangi konsumsi listrik dari PLN, dan lebih ramah lingkungan. Setelahnya dapat dianalisis biaya investasinya dengan mempertimbangkan potensi energi tahunan dan biaya pembangunan PLTS tersebut sebagai pembanding dengan jika sepenuhnya menggunakan suplai listrik dari PLN. Potensi pengurangan konsumsi listrik PLN dari pemasangan PLTS RS Soewandhie sebesar 40 kWp ini nantinya diperkirakan sebesar 61,69 MWh per tahunnya.
================================================================================================
The Solar Power Plant (PLTS) is a notion created in order to support Kebijakan Energi Nasional (KEN) mission to reach the use of renewable energy up to 23% by 2025. The use of PLTS is now widely applied in every aspect of life, in private and commercial buildings. Soewandhie Hospital is one of the consumers who plan to use PLTS to supply half of their daily electrical energy needs. In its implementation, PLTS has limited energy; it makes the resulting energy has a fluctuating value. This is caused by PLTS' source of energy, which is natural light emitted by the sun. However, the 24 hours load profile of Soewandhie Hospital is relatively constant, so that during the day the energy generated by the PLTS could be directly absorbed by the load. Therefore, a proper design is needed so that the PLTS may supply maximum electrical energy to reduce electricity consumption from PLN, and be more environmentally friendly. Then, the investment costs could be analyzed by considering the annual energy and the cost of building the PLTS as a comparison with the use of electricity supply from PLN. After the installation of solar power plant on Soewandhie Hospital Surabaya with 40 kWp capacity, it will reduce the electricity consumption from PLN approximately 61,69 MWh each year.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analisis Investasi, Renewable Energy, On-Grid PV System, Investment Analysis, Renewable Energy, On-Grid PV System.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1056 Solar powerplants
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Ardito Nugroho
Date Deposited: 15 Aug 2021 03:26
Last Modified: 15 Aug 2021 03:26
URI: http://repository.its.ac.id/id/eprint/86647

Actions (login required)

View Item View Item