Perencanaan Pembangkit Listrik Tenaga Air (PLTA) Di Kabupaten Tapin Dengan Memanfaatkan Aliran Bendungan Tapin

Tandi, Abel Kusuma (2021) Perencanaan Pembangkit Listrik Tenaga Air (PLTA) Di Kabupaten Tapin Dengan Memanfaatkan Aliran Bendungan Tapin. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111740000097-Undergraduate_Thesis.pdf] Text
03111740000097-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (7MB) | Request a copy

Abstract

Kabupaten Tapin memiliki bendungan yang berpotensi menyimpan tampungan yang cukup besar. Cangkupan irigasi yang bisa dipasok dari tampungan tersebut mencapai 5472 ha. Bendungan Tapin memiliki ketinggian 70 m dan memiliki total tampungan maksimum sebesar 111.071.430 m3. Dengan ketinggian bendungan yang tinggi dan tampungan yang besar, potensi penghasilan daya dan energi listrik dari bendungan tersebut sangatlah besar.
Produksi listrik di Pulau Kalimantan dengan memanfaatkan Pembangkit Listrik Tenaga Air (PLTA) sangatlah minim. Mayoritas produksi listrik masih dipasok dengan memanfaatkan Pembangkit Listrik Tenaga Diesel (PLTD). Hal tersebut membuat produksi listrik menjadi mahal dan harga listrik menjadi tinggi di wilayah Kalimantan. Penggantian PLTD menjadi PLTA merupakan solusi dari permasalahan tersebut. Selain biaya produksi listrik yang akan menjadi murah, PLTA dapat mengurangi pencemaran lingkungan yang timbul karena pemakaian bahan bakar fosil dari PLTD. Perencanaan PLTA ditujukan juga untuk pendukung proyek interkoneksi di Kalimantan. Perusahaan Listrik Negara (PLN) menargetkan proyek interkoneksi di Pulau Kalimantan akan selesai pada tahun 2022 sebagai upaya pemerataan listrik di seluruh wilayah Kalimantan.
Dari perencanaan PLTA diharapkan dapat menghasilkan daya dengan rentang 1 kW – 10 kW, di mana daya ini dapat membantu keberhasilan kerja PLN dalam penyelesaian program listrik di Kalimantan. Dari analisa yang telah dilakukan didaptakan debit andalan 80% sebesar 1,751 m3/dt dengan tinggi jatuh (beda ketinggian) sebesar 55 m. Turbin yang akan digunakan adalah turbin Francis dengan jumlah 2 yang masing-masing beroperasi pada debit 0,876 m3/dt. Dengan energi yang diperoleh dari perhitungan sebesar 6.409.945 kWh dalam 1 tahun.
================================================================================================
Tapin District has a dam that has the potential to store a large enough reservoir. Coverage of irrigation that can be supplied from the reservoir reaches 5472 ha. Tapin Dam has a height of 70 m and has a total maximum reservoir of 111,071,430 m3. With a high dam height and large reservoir, the potential for generating power and electrical energy from the dam is very large.
The production of electricity on the Kalimantan by utilizing hydroelectric power plants (PLTA) is very minimal. The majority of electricity production is still supplied by utilizing Diesel Power Plants (PLTD). This makes electricity production become more expensive and electricity prices high in Kalimantan. Replacing PLTD to PLTA is a solution to this problem. In addition to the low cost of electricity production, hydropower plants can reduce environmental pollution caused by the use of fossil fuels from PLTD. Hydropower planning is also intended to support interconnection projects in Kalimantan. The State Electricity Company (PLN) targets the interconnection project on the island of Kalimantan to be completed in 2022 as an effort to distribute electricity throughout Kalimantan.
From the hydropower planning, it is expected to produce power in the range of 1 kW – 10 kW, where this power can help the success of PLN's work in completing the electricity program in Kalimantan. From the analysis that has been carried out, it is found that 80% reliable discharge is 1.751 m3/sec with a height of fall (height difference) of 55 m. The turbine that will be used is a Francis turbine with a total of 2, each of which operates at a flow rate of 0.876 m3/s. With the energy obtained from the calculation of 6,409,945 kWh in 1 year.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kabupaten Tapin, PLTA, Langkah-langkah perencanaan, Daya, Energi, Tapin district, Hydropower plant, Planning, Power, Energy
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1519.S68 Hydroelectric power plants
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Abel Kusuma Tandi
Date Deposited: 15 Aug 2021 01:35
Last Modified: 15 Aug 2021 01:35
URI: http://repository.its.ac.id/id/eprint/86713

Actions (login required)

View Item View Item