Evaluasi Koordinasi Proteksi Pada Sistem Kelistrikan Kilang PT. Pertamina RU VII Syarif Kasim

Ahmad, Fahriza (2021) Evaluasi Koordinasi Proteksi Pada Sistem Kelistrikan Kilang PT. Pertamina RU VII Syarif Kasim. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111740000076-Undergraduated_Thesis.pdf] Text
07111740000076-Undergraduated_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (2MB) | Request a copy

Abstract

Sistem Proteksi merupakan suatu sistem pengaman terhadap peralatan listrik. Proteksi pada sistem kelistrikan industri bertujuan untuk mengurangi kerusakan peralatan akibat adanya gangguan yang terjadi dan juga semuanya harus terkoordinasi dengan baik sehingga jika terjadi gangguan dapat bekerja secara cepat dan akurat untuk mengam ankan gangguan pada suatu jaringan listrik.PT. Pertamina RU VII Syarif Kasim sebagai perusahaan penambangan minyak dan gas bumi juga
membutuhkan koordinasi proteksi yang handal. Pada tugas akhir ini akan dilakukan setting rele proteksi pada sistem kelistri kan PT. Pertamina RU VII Syarif Kasim karena adanya penggantian generator eksisting menjadi
Generator Turbine Gas (GTG) dengan memanfaatkan gas flare serta meninjau desain kelistrikan sistem distribusi terkait pemilihan tegangan sistem dan urgensinya. Pada tugas akhir ini akan membahas tentang analisis dan evaluasi terhadap pengaman di PT. Pertamina RU VII Syarif Kasim pada sistem kelistrikan rencana pengembangan . Pembahasan pada buku ini akan berfokus pada pengaturan koordinasi rele arus lebih
gangguan fasa dan gangguan tanah. Kemudian hasil dari pengaturan rele arus lebih gangguan fasa dan tanah akan di simulasikan menggunakan ETAP . Dari hasil analisis koordinasi proteksi kurva rele pengaman sistem
pengembangan direkomendasikan untuk menambah rele untuk mendeteksi arus gangguan hubung singkat fasa maupun tanah. Juga direkomendasikan untuk menambah rele eksternal guna mendapatkan koordinasi antar rele yang tepat
==================================================================================================
The Protection System is a safety system for electrical equipment. Protection in industrial electrical systems aims to reduce equipment damage due to disturbances that occur. Also, everything must be well-coordinated. If a disturbance occurs, it can work quickly and accurately to secure interference in an electrical network.PT. Pertamina RU VII Syarif Kasim, an oil and gas mining company, needs reliable protection coordination. In this final project, the protection relay setting on the electrical system of PT. Pertamina RU VII Syarif Kasim due to the replacement of the existing generator into a Gas Turbine Generator (GTG) by utilizing gas flares and reviewing the electrical design of the distribution system regarding the selection of system voltage and its urgency. This final project will discuss the analysis and evaluation of security at PT. Pertamina RU VII Syarif Kasim on the electricity system development plan. The discussion in this book will focus on the coordination settings of the phase fault and ground fault overcurrent relays. Then the results of the phase and ground fault overcurrent relay settings will be simulated using ETAP. From the coordination analysis of the protection curve of the safety relay curve, the development system is recommended to add a relay to detect phase or ground short circuit fault currents. It is also recommended to add external relays in order to get proper coordination between relays.

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: fahriza ahmad
Date Deposited: 19 Aug 2021 07:14
Last Modified: 19 Aug 2021 07:14
URI: http://repository.its.ac.id/id/eprint/87714

Actions (login required)

View Item View Item