Nidhommuddin, Muhammad (2021) Rancang Bangun Sistem Kontrol pada Electrical Charging Station Sebagai Pengisi Daya Baterai pada Kendaraan Listrik Berbasis Internet. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
10511710000062-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (3MB) | Request a copy |
Abstract
Sistem charger yang dimiliki oleh kendaraan listrik salah satunya GESITS belum terdapat otomatisasi untuk memutus atau menghubungkan arus listriknya. Charger GESITS saat ini hanya terdapat indikator lampu merah hijau dan belum terdapat sistem monitoring untuk mengetahui beban penggunaan saat melakukan pengisian ulang baterai. Untuk itu pengguna akan kesulitan untuk mengetahui berapa biaya yang dihabiskan untuk melakukan pengisian ulang baterai kendaraan listrik GESITS. Dalam Tugas Akhir ini telah dirancang sebuah prototipe berupa Electrical Charging Station berbasis internet yang didalamnya terdapat sistem kontrol yang berfungsi untuk cut-off arus listrik secara otomatis. Kontroler yang yang digunakan yaitu Node MCU ESP-32 untuk melakukan kontrol on/off pada relay kemudian mengirimkan data pengukuran oleh Power Meter iEM 2050 ke web server. Telah didapatkan nilai eror pengukuran tegangan sebesar 0.14% dan nilai akurasi sebesar 0.9986. Pada pengukuran arus didapatkan nilai eror sebesar 2.02% dan nilai akurasi sebesar 0.9798. Pengujian sistem kontrol telah diberikan setpoint sebesar 0.02 KwH untuk memutus arus listrik secara otomatis. Didapatkan estimasi biaya sebesar Rp22 dan lama waktu pengisisan sekitar 3 menit. Pada sistem monitoring terdapat delay pengiriman data sebesar 5 detik. Tugas Akhir ini merupakan salah satu inovasi untuk mengatasi permasalahan terkait penggunaan energi listrik dan charging GESITS.
===================================================================================================
Charger system owned by electric vehicles, one of which is GESITS has no automation to disconnect or connect the electric current. The GESITS charger currently has only a green red light indicator and there is no monitoring system to determine the load of use when recharging the battery. Therefore users will find it difficult to know how much it costs to recharge the battery of GESITS electric vehicles. In this Final Task has been designed a prototype in the form of internet-based Electrical Charging Station in which there is a control system that serves to cut-off the electric current automatically. The controller used is the ESP-32 MCU Node to perform on/off control on the relay and then send measurement data by iEM 2050 Power Meter to the web server. A voltage measurement error value of 0.14% and an accuracy value of 0.9986 have been obtained. In the current measurement obtained error value of 2.02% and accuracy value of 0.9798. Control system testing has been given a setpoint of 0.02 KwH to automatically disconnect the electric current. The estimated cost is Rp22 and the filling time is about 3 minutes. In the monitoring system there is a delay of sending data by 5 seconds. This final task is one of the innovations to overcome problems related to the use of electrical energy and charging GESITS.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Sistem Kontrol, Sistem Monitoring, GESITS, Power Meter, Control System, Monitoring System, GESITS, Power Meter |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1007 Electric power systems control T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3070 Automatic control |
Divisions: | Faculty of Vocational > Instrumentation Engineering |
Depositing User: | Muhammad Nidhommuddin |
Date Deposited: | 20 Aug 2021 03:37 |
Last Modified: | 20 Aug 2021 03:37 |
URI: | http://repository.its.ac.id/id/eprint/88830 |