Penerapan Pembangkit Listrik Tenaga Picohidro Turbin Archimedes Subsistem Manajemen Energi Cerdas dengan Metode Fuzzy Mamdani untuk Penerangan Jalan

Putra, Rio Andika (2021) Penerapan Pembangkit Listrik Tenaga Picohidro Turbin Archimedes Subsistem Manajemen Energi Cerdas dengan Metode Fuzzy Mamdani untuk Penerangan Jalan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10311710003015-Undergraduate_Thesis.pdf]
Preview
Text
10311710003015-Undergraduate_Thesis.pdf - Accepted Version

Download (6MB) | Preview

Abstract

Madura merupakan daerah dengan rasio elektrifikasi terendah di Jawa Timur. Keadaan ini disebabkan oleh kecilnya jumlah KK di satu desa dengan jarak per desa yang cukup jauh. Selain itu dengan kondisi penerangan jalan umum yang tidak berfungsi dengan baik dapat menyebabkan terjadinya kriminalitas. Penelitian ini bertujuan untuk mengetahui pembuatan penerangan jalan subsistem manajemen energi cerdas serta efisiensi energi listrik. PLTPH turbin Archimedes yang dibuat menggunakan sumber daya air. Metode yang digunakan dalam penelitian ini adalah fuzzy mamdani yang diterapkan pada cara kerja lampu penerangan jalan. Hasil yang diperoleh dari penelitian ini adalah pada pukul 17.43 lampu secara otomatis menyala redup, kemudian pada saat ada orang yang lewat maka lampu secara otomasi akan menyala terang selama 10 detik, dan akan redup kembali serta pada pukul 05.17 lampu secara otomatis akan mati. Efisiensi energi dapat dilakukan dengan merubah nilai tegangan listrik melalui nilai PWM yang diubah agar keluaran nilai tegangan dapat sesuai dengan kebutuhan.
Kata kunci: Fuzzy Mamdani, Lampu Penerangan Jalan, Madura, Nilai PWM, PLTPH, Turbin Archimedes, Tegangan Listrik.
====================================================================================================
Madura is the area with the lowest electrification ratio in East Java. This situation is caused by the small number of households in one village with a fairly far distance per village. In addition, the condition of public street lighting that does not function properly can lead to crime. This study aims to determine the manufacture of street lighting intelligent energy management subsystem and electrical energy efficiency. Archimedes turbine PLTPH made using water resources. The method used in this research is fuzzy mamdani which is applied to the workings of street lighting. The results obtained from this study are that at 17:43 the lights automatically turn dim, then when someone passes by, the lights will automatically turn on brightly for 10 seconds, and will dim again and at 05:17 the lights will automatically turn off. Energy efficiency can be done by changing the value of the mains voltage through the changed PWM value so that the output voltage value can be in accordance with the needs.
Keywords: Fuzzy Mamdani, Street Lighting, Madura, PWM Value, PLTPH, Archimedes Turbine, Electric Voltage.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Fuzzy Mamdani, Lampu Penerangan Jalan, Madura, Nilai PWM, PLTPH, Turbin Archimedes, Tegangan Listrik, Street Lighting, PWM Value, Archimedes Turbine, Electric Voltage.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Vocational > 36304-Automation Electronic Engineering
Depositing User: RIO ANDIKA PUTRA
Date Deposited: 25 Aug 2021 02:17
Last Modified: 30 Sep 2024 00:43
URI: http://repository.its.ac.id/id/eprint/89363

Actions (login required)

View Item View Item