Analisis Perbandingan Waktu Dan Biaya Pelaksanaan Pekerjaan Pelat Lantai Dengan Metode Pracetak Antara Flyslab Dan Halfslab Pada Gedung Hotel Grand Mercure Malang

Permatasari, Annisa Putri (2021) Analisis Perbandingan Waktu Dan Biaya Pelaksanaan Pekerjaan Pelat Lantai Dengan Metode Pracetak Antara Flyslab Dan Halfslab Pada Gedung Hotel Grand Mercure Malang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010072-Undergraduate_Thesis.pdf] Text
10111710010072-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (15MB) | Request a copy

Abstract

Zaman globalisasi seperti sekarang, peningkatan infrastruktur sangat signifikan terutama pada pembangunan gedung. Hal ini dapat mengakibatkan luas lahan semakin mengecil karena meningkatnya jumlah penduduk dan kebutuhan tempat tinggal. Cara untuk menyelesaikan permasalahan tersebut adalah dengan membangun gedung bertingkat yang membutuhkan lahan sedikit. Metode yang lebih cocok untuk pembangunan gedung tinggi yaitu menggunakan metode pracetak karena biaya pelaksanaan lebih ekonomis dan waktu pelaksanaan lebih efisien. Pada penelitian ini akan dilakukan perbandingan pekerjaan pelat lantai menggunakan metode pracetak karena pekerjaan pelat lantai memerlukan waktu dan biaya yang tidak sedikit dalam pelaksanaannya. Ada 2 metode pracetak yang akan dipakai untuk perbandingan yaitu metode flyslab dan halfslab pada proyek Gedung Hotel Grand Mercure Malang lantai 5 – 14. Analisa perbandingan menggunakan metode pracetak didapatkan hasil yaitu untuk metode flyslab membutuhkan waktu pelaksanaan selama 255 hari kerja dengan biaya pelaksanaan sebesar Rp. 16,841,849,643 sedangkan dengan metode halfslab membutuhkan waktu pelaksanaan 265 hari kerja dengan biaya pelaksanaan sebesar Rp. 18,035,890,031. Jadi metode flyslab lebih unggul dibandingkan metode halfslab dari segi waktu dan biaya pelaksanaan. ====================================================================================================
In the era of globalization, infrastructure improvement is very significant, especially in building construction. This can result in a reduced land area due to increasing population and housing needs. The way to solve this problem is to build tall buildings that require little land. A more suitable method for the construction of high-rise buildings is to use the precast method because the implementation costs are more economical and the execution time is more efficient. In this study, a comparison of floor slab work with the precast method will be carried out because the slab work requires a lot of time and cost in construction. There are 2 precast methods that will be used as a comparison, namely the flyslab and halfslab methods on Hotel Grand Mercure Malang Building project, floors 5-14. Comparative analysis using the precast shows that flyslab method takes 255 working days with a cost of Rp. 16,841,849,643 but halfslab method takes 265 working days with a cost of Rp. 18,035,890,031. So, flyslab method is superior to halfslab method in terms of time and cost

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: perbandingan, pelat pracetak, flyslab, halfslab
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
T Technology > TH Building construction > TH2521 Floors and flooring
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Annisa Putri Permatasari
Date Deposited: 25 Aug 2021 01:57
Last Modified: 25 Aug 2021 01:57
URI: http://repository.its.ac.id/id/eprint/90113

Actions (login required)

View Item View Item