Zukiardi, Juninno Chandra (2021) Estimasi Biaya Penerapan Sistem Manajemen Keselamatan Konstruksi Pekerjaan Box Girder Menggunakan Metode HIRADC (Studi Kasus: Proyek Kereta Cepat Jakarta-Bandung). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111710013101-Undergraduate_Thesis.pdf - Accepted Version Download (16MB) | Preview |
Abstract
Pembangunan proyek konstruksi harus mempertimbangkan aspek keselamatan dan kesehatan lingkungan kerja. Biaya pengadaan keselamatan dan kesehatan lingkungan kerja perlu diperhitungkan dalam perhitungan estimasi biaya proyek pembangunan.
Tugas akhir ini merencanakan Sistem Manajemen Keselamatan dan Kesehatan (SMKK) pada pekerjaan box girder Proyek Kereta Cepat Jakarta-Bandung dengan menggunakan metode HIRADC (Hazard Identification, Risk Assessment and Determining Control). Pekerjaan box girder pada Proyek Kereta Cepat Jakarta-Bandung terdiri dari 9 pekerjaan, dan 32 sub pekerjaan. Dengan menggunakan metode HIRADC dalam menyusun perencanaan SMKK, didapatkan 110 uraian mengenai sumber bahaya dan potensi bahaya pada pekerjaan tinjauan; dengan jumlah identifikasi bahaya pada risiko tinggi sebanyak 28, risiko sedang sebanyak 49, dan risiko rendah sebanyak 34, dan estimasi biaya SMKK sebesar Rp 1.051.962.140,- atau sama dengan 1,56% dari nilai kontrak pekerjaan struktur. ================================================================================================
Work environment safety and health aspect on construction project building should be considered. The procurement cost of work environment safety and health should be counted on costs estimation calculation project building.
This final project planned Safety and Health Management System on box girder work of Jakarta-Bandung High Speed Train Project using HIRADC (Hazard Identification, Risk Assessment and Determining Control) method. By HIRADC method, was found 110 hazard identification; 28 high risks, 49 middle risks, and 34 low risks, and Safety and Health Management System costs estimation in the amount of Rp 1.051.962.140,- equal to 1,56% from structure contract value.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Perencanaan SMKK, Box Girder, HIRADC,Safety and Health Management System |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Juninno Chandra Zukiardi |
Date Deposited: | 28 Aug 2021 17:32 |
Last Modified: | 08 Oct 2024 03:48 |
URI: | http://repository.its.ac.id/id/eprint/90246 |
Actions (login required)
View Item |