Analisis Perhitungan Waktu Dan Biaya Pelaksanaan Proyek Pembangunan Gedung Fakultas Psikologi Universitas Islam Negeri Sunan Ampel (UINSA) Surabaya Menggunakan Pelat Sistem Half Slab

Jannah, Arina Fakhrul (2021) Analisis Perhitungan Waktu Dan Biaya Pelaksanaan Proyek Pembangunan Gedung Fakultas Psikologi Universitas Islam Negeri Sunan Ampel (UINSA) Surabaya Menggunakan Pelat Sistem Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010005-Undergraduate_Thesis.pdf] Text
10111710010005-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (22MB) | Request a copy

Abstract

Perkembangan dunia konstruksi di Indonesia semakin berkembang pesat salah satunya ditandai dengan banyaknya pembangunan gedung bertingkat tinggi. Dari hal tersebut perusahaan konstruksi berkompetisi untuk membuat perencanaan yang baik dalam memilih metode kerja agar memperoleh waktu yang singkat serta biaya yang minim dengan mutu tinggi. Oleh karena itu, sebelum pelaksanaan suatu proyek pembangunan dimulai perlu dilakukan suatu perencanaan untuk mengetahui estimasi anggaran biaya dan lama waktu pengerjaan suatu proyek pembangunan tersebut.
Dalam penelitian ini digunakan modivikasi pelat konvensional menjadi pelat dengan sistem half slab pada Proyek Pembangunan Gedung Fakultas Psikologi Universitas Islam Negeri Sunan Ampel (UINSA) Surabaya dimana bangunan ini terdiri dari 9 lantai dengan lantai atap beton. Pada pengerjaan half slab tidak membutuhkan pemasangan bekisting saat proses pemasangan dilapangan sehingga berpengaruh pada kecepatan pelaksanaan proyek tersebut.
Perhitungan Analisa biaya dan waktu dihitung berdasarkan metode pelaksanaan yang digunakan sesuai dengan teori dan dikaitkan dengan kondisi proyek. Dalam perhitungan waktu pelaksanaan dimulai dengan menentukan item pekerjaan terlebih dahulu dan dilanjutkan dengan perhitungan produktivitas sehingga menghasilkan durasi dan penyusunan jadwal pekerjaan. Setelah menghitung waktu pelaksanaan maka dilanjutkan dengan menghitung anggaran biaya. Hasil akhir dari tugas ini adalah penjadwalan, anggaran biaya pelaksanaan dan Kurva S. Dari hasil perhitungan diperoleh total biaya pelaksanaan sebesar Rp. 15.353.408.364 dengan durasi 228 hari .
=======================================================================================================
The development of the construction world in Indonesia is growing rapidly, one of which is marked by the large number of high-rise buildings. From this, construction companies compete to make good plans in choosing work methods in order to obtain a short time and minimal cost with high quality. Therefore, before the implementation of a development project begins, it is necessary to do a plan to find out the estimated cost and duration of the construction project.
In this study, the modification of conventional slabs into plates with a half slab system was used in the Construction Project of the Faculty of Psychology, State Islamic University Sunan Ampel (UINSA) Surabaya, where this building consists of 9 floors with a concrete roof floor. Half slab construction does not require the installation of formwork during the installation process in the field so that it affects the speed of project implementation.
Calculation Cost and time analysis is calculated based on the implementation method used in accordance with theory and associated with project conditions. So as to produce an efficient cost and time analysis calculation. In the calculation of the implementation time, it begins by determining the work items first and continues with the calculation of productivity so as to produce the duration and preparation of the work schedule. The final result of this task is scheduling, implementation cost budget and S curve. From the calculation result, the total cost is Rp. 15.241.328.364 with a duration of 228 days.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Anggaran Biaya Pelaksanaan, Half Slab, Kurva S, Waktu pelaksanaan, Implementation Cost Budget, Half Slab, S Curve, Implementation Time
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T58.8 Productivity. Efficiency
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Arina Fakhrul Jannah
Date Deposited: 30 Aug 2021 04:27
Last Modified: 30 Aug 2021 04:27
URI: http://repository.its.ac.id/id/eprint/90489

Actions (login required)

View Item View Item