Salwaludna, Mega Afanin (2017) Perhitungan Waktu dan Biaya Pelaksanaan pada Proyek Hotel Padma Semarang dengan Menggunakan Aluminium Formwork. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
10111710013011-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (49MB) | Request a copy |
Abstract
Proyek akhir terapan ini membahas mengenai perhitungan waktu dan biaya pelaksanaan pembangunan Hotel Padma Semarang. Gedung ini menempati lahan seluas ± 23210 m2 yang berada di Jalan Sultan Agung No. 86 Kota Semarang. Gedung Hotel Padma Semarang terdiri dari 13 lantai dengan rincian 11 lantai (Ground Floor, Mezzanine Floor, dan 1st - 9th Floor) dan 2 basement. Proyek pembangunan ini merupakan proyek yang menggunakan struktur atas beton bertulang serta struktur atap menggunakan konstruksi baja dan beton.
Perhitungan waktu dan biaya pelaksanaan proyek ini dihitung menggunakan metode pelaksanaan yang digunakan sesuai dengan teori dan ilmu dari berbagai referensi dengan memberi batasan perhitungan pada bagian struktur atas mulai dari lantai 1 sampai dengan 9 dan lantai atap. Proyek akhir terapan ini merencanakan penggantian metode pelaksanaan pada bekisting. Bekisting aluminium atau aluminium formwork akan digunakan untuk menggantikan bekisting sebelumnya yaitu bekisting konvensional yang digunakan pada pelat, balok dan tangga serta bekisting sistem peri yang digunakan pada kolom dan shear wall. Penjadwalan proyek menggunakan metode Precedence Diagram Method (PDM) dengan menggunakan program aplikasi Microsoft Project dan menghasilkan Kurva S. Hasil akhir pada proyek akhir ini adalah metode pelaksanaan pekerjaan, rekapitulasi durasi pelaksanaan proyek, biaya pelaksanaan proyek, dan kurva S.
Dari hasil analisis, didapatkan durasi pekerjaan selama 140 hari kerja dan biaya pelaksanaan sebesar Rp. 17,080,603,559.14
================================================================================================
The preparation of the final project entitled Time Calculation And Budget Implemation Of Padma Hotel Semarang Using Aluminium Formwork, This building occupies an area of ± 23210 m2 which is located at Jalan Sultan Agung No. 86 Semarang City. Hotel Padma Semarang building consists of 13 floors with details of 11 floors (Ground Floor, Mezzanine Floor, and 1st - 9th Floor) and 2 basements. This development project is a project that uses a reinforced concrete upper structure and a roof structure using steel and concrete construction. The calculation of the time and cost of implementing this project is calculated using the implementation method used in accordance with the theory and knowledge from various references by limiting the calculation of the upper structure from floors 1 to 9 and the roof floor. This final applied project plans to replace the implementation method on the formwork. Alform or aluminium formwork will be used to replace the previous formwork, namely conventional formwork used in slabs, beams and stairs and peri system formwork used in columns and shear walls. Project scheduling uses the Precedence Diagram Method (PDM) using the Microsoft Project application program and produces an S Curve. The final result in this final project is the method of work, recapitulation of project implementation duration, project implementation costs, and S curve.
From the analysis results, obtained the duration of work for 140 working days and the implementation fee of Rp. 17,080,603,559.14
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Time and cost of works, Scheduling, S Curve Waktu dan Biaya Pelaksanaan, Penjadwalan, Kurva S |
Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | MEGA AFANIN SALWALUDNA |
Date Deposited: | 29 Aug 2021 18:44 |
Last Modified: | 29 Aug 2021 18:44 |
URI: | http://repository.its.ac.id/id/eprint/90542 |