ESTIMASI WAKTU DAN BIAYA PROYEK PEMBANGUNAN JALAN TOL SEMARANG-DEMAK SEKSI 2 STA.17+325 s/d STA.22+350

Syahbandaria, Maykhisiti (2021) ESTIMASI WAKTU DAN BIAYA PROYEK PEMBANGUNAN JALAN TOL SEMARANG-DEMAK SEKSI 2 STA.17+325 s/d STA.22+350. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013025_Undergraduate Thesis.pdf] Text
10111710013025_Undergraduate Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (23MB) | Request a copy

Abstract

Jalan Tol Semarang-Demak Seksi 2 direncanakan memiliki panjang tol kurang lebih 16,31 km yaitu STA 10+690 s/d STA 27+000 yang dimulai dari Kecamatan Sayung. Owner proyek ini adalah PT.PP (Persero) Tbk, PT.PP berkerjasama antara PT.Virama Karya sebagai konsultan supervisi dan PT. Wira Nusantara Bumi sebagai konsultan perencana. Pada setiap proyek konstruksi agar proyek dapat berjalan dengan baik, maka harus terdapat manajemen perencanaan yang baik sejak awal. Maka diperlukan perencanaan terhadap kebutuhan biaya melalui suatu penjadwalan biaya untuk mendapatkan jumlah biaya yang diperlukan berdasarkan waktu pelaksanaan proyek.
Dalam melakukan perhitungan analisa biaya dan waktu pada pembangunan proyek ini dilakukan dengan menentukan item pekerjaan terlebih dahulu lalu menghitung volume dan pemilihan metode yang efisien sehingga menghasilkan durasi,penyusunan jadwal pekerjaan dan biaya pada proyek ini, untuk biaya pelaksanaan menggunakan peraturan dan harga yang berlaku di kota Semarang.
Berdasarkan hasil perhitungan yang telah dilakukan diperoleh hasil waktu dan biaya pekerjaan senilai Rp298.574.537.869,- dengan waktu pelaksanaan 137 hari kalender.
======================================================================================================
Semarang-Demak Toll Road Section 2 is planned to have a toll length of approximately 16.31 km STA 10+690 to STA 27+000 starting from Sayung District. The owner of this project is PT. PP (Persero) Tbk, PT. PP in collaboration between PT. Virama Karya as a supervision consultant and PT. Wira Nusantara Bumi as a planning consultant. In every construction project so that the project can run well, there must be good planning management from the start. So it is necessary to plan the cost requirements through a cost scheduling to get the required amount of costs based on the project implementation time.
In calculating the cost and time analysis on the construction of this project, it is done by determining the work items first and then calculating the volume and choosing an efficient method so as to produce duration, preparation of work schedules and costs on this project, for implementation costs using regulations and prices applicable in the city Semarang.
Based on the results of calculations that have been carried out, the results of the time and cost of work are Rp298.574.537.869,- with an implementation time of 137 calendar days.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kata kunci : biaya dan waktu, metode, penjadwalan Keywords : cost and time, method, scheduling
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Maykhisti Syahbandaria
Date Deposited: 26 Aug 2021 06:45
Last Modified: 26 Aug 2021 06:45
URI: http://repository.its.ac.id/id/eprint/90544

Actions (login required)

View Item View Item