Analisa Perbandingan Waktu dan Biaya Pelaksanaan Penggunaan Bekisting Aluminium Dengan Bekisting Sistem (Peri) Pada Proyek Menara Bri Gatot Subroto

Ramadhan, Yahya Abdurrahman (2021) Analisa Perbandingan Waktu dan Biaya Pelaksanaan Penggunaan Bekisting Aluminium Dengan Bekisting Sistem (Peri) Pada Proyek Menara Bri Gatot Subroto. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013098_Undergraduate_Theses.pdf] Text
10111710013098_Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (36MB) | Request a copy

Abstract

Dengan seiring berkembangnya teknologi yang pesat, tentu banyak pekembangan teknologi konstruksi yang mampu memudahkan dan mempercepat proses pelaksanaannya. Salah satunya adalah penggunaan bekisting Aluminium yang dapat menghemat biaya, tenaga kerja, bahan, serta waktu pelaksanaan proyek konstruksi. Tugas akhir ini ini membahas mengenai perhitungan waktu dan biaya pelaksanaan pada pembangunan Menara BRI Gatot Subroto menggunakan metode Bekisting Aluminium (Aluminium Formwok) dan dibandingkan dengan metode bekisting sistem (PERI). Tujuan dari perhitungan ini diperoleh kelebihan dan kekurangan kedua metode tersebut dari segi waktu maupun segi biaya. Gedung ini mempunyai luas bangunan sebesar 1,600 m² yang terdiri dari 37 lantai. Perhitungan waktu dan biaya pelaksanaan hanya difokuskan pada pekerjaan struktur atas yang terdiri dari kolom, shearwall, balok, pelat dan tangga pada lantai 6 sampai 15. Dari perhitungan tersebut dihasilkan Rencana Anggaran Pelaksanaan (RAP) dan kurva S pada kedua metode.
Tugas Akhir ini menghasilkan hasil sebagai berikut, dari segi biaya metode aluminium formwork didapatkan harga total adalah : Rp.27.563.633.690 dan untuk bekisting sistem (PERI) harga total adalah : Rp.27.858.986.687. Sedangkan dari segi waktu metode Aluminium formwork diselesaikan dengan durasi 246 hari sedangkan untuk metode bekisting sistem (PERI) adalah 270 hari. Dari segi biaya metode yang paling murah adalah menggunakan bekisting aluminium, dan untuk segi waktu paling cepat menggunakan bekisting Aluminium.
======================================================================================================
Along with the rapid development of technology of course there are many developments in construction technology that facilitate and speed up the implementation process. One of them is the use of aluminium formwork which can save cost, labour, materials, and project execution time. This final project discusses the calculation of the time and cost of implementing the construction of the BRI Gatot Subroto Tower using the Aluminium formwork method and compared it to the system (PERI) formwork. The purpose of this calculation is to obtain both advantages and disadvantages in terms of time and cost. This building has a building area of 1600m² consisting of 37 floors. The calculation of time and implementation is only based on the work of structure consisting of columns, shearwalls, beams, plates, and stairs on floors 6 to 15. From these calculations, an implementation Budget plan and S curve are generated for both methods.
This Final Project produces the following results. In terms of the cost of the aluminium formwork method, the total price obtained is.:Rp.27.563.633.690. and for the formwork system (PERI) the total price is : Rp.27.858.986.687. while in terms of time the aluminium formwork method is completed with a duration of 246 days while the system (PERI) formwork method Is 270 days. In terms of cost, the cheapest method is using aluminium formwork, while for the fastest time, aluminium formwork is also used.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Aluminium Formwork, Sistem (PERI), waktu pelaksanaan, biaya pelaksanaan, RAP, Kurva
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Yahya Abdurrahman Ramadhan
Date Deposited: 31 Aug 2021 05:26
Last Modified: 31 Aug 2021 05:26
URI: http://repository.its.ac.id/id/eprint/90645