Analisis Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Pembangunan Jalan Lingkar Luar Timur Surabaya (JLLT) Dengan Metode Job Hazard Analysis (JHA)

Ubadah, Nur Ubaidillah (2021) Analisis Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Pembangunan Jalan Lingkar Luar Timur Surabaya (JLLT) Dengan Metode Job Hazard Analysis (JHA). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010090-Undergraduate_Theses.pdf]
Preview
Text
10111710010090-Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Pembangunan infrastruktur dinilai menjadi kunci penting dalam transformasi ekonomi sosial. Dibalik pembangunan infrastruktur ada beberapa hal yang harus dipertimbangkan dengan matang, salah satunya adalah aspek keselamatan. Kemungkinan risiko kecelakaan yang ada bisa saja menjadi salah satu penyebab terjadinSya kegagalan suatu proyek
kontruksi. Berdasarkan hal itu maka diperlukan penerapan sistem manajemen keselamatan dan kesehatan kerja (SMK3) Konstruksi yang efisien untuk sebuah proyek konstruksi.
Perencanaan SMK3 Konstruksi terdiri dari identifikasi bahaya, penilaian risiko dan pengendalian risiko. Job Hazard Analysis (JHA)
adalah suatu metode untuk mengidentifikasi potensi bahaya yang berfokus pada tugas pekerjaan atau uraian kerja sebagai cara untuk mengidentifikasi bahaya sebelum terjadi. Setelah perencanaan SMK3 Konstruksi, maka dapat dihitung anggaran biaya yang diperlukan untuk penyelenggaraan SMK3 Konstruksi tersebut. Pada Proyek Akhir Terapan ini penulis merencanakan SMK3 (Sistem Manajemen Keselamatan dan Kesehatan Kerja) Konstruksi mengunakan metode Job Hazard Analysis (JHA) dengan studi kasus pada Proyek Pembangunan Jalan Lingkar Luar Timur Surabaya (JLLT)Pekerjaan Segmen 1 (Sta 0+000 S/D Sta 0+875) Frontage Sisi Kiri dengan batasan pekerjaan tiang pancang, pekerjaan pile head dan pekerjaan full slab. Dari Perencanaan SMK3 (Sistem Manajemen Keselamatan dan Kesehatan Kerja) Konstruksi tersebut didapatkan 26 risiko bahaya yang
mungkin terjadi. Bahaya yang paling sering terjadi adalah terbentur alat/material. Dari penilaian tersebut banyak dari bahaya yang teridentifikasi memiliki tingkat risiko sedang. Dari perencanaan tersebut juga didapatkan rencana anggaran biaya sebesar Rp 476.511.003 untuk penyelenggaraan SMK3 Konstruksi
=====================================================================================================
Infrastructure development is considered to be an important key
in the transformation of the social economy. Behind infrastructure development there are several things that must be considered carefully, one of which is the safety aspect. The possibility of the risk of an existing
accident could be one of the causes of the failure of a construction project.Based on this, it is necessary to implement an efficient construction OHS (Occupational Safety and Health Management System) for a construction project.
Construction OHS consists of hazard identification, risk
assessment and risk control. Job Hazard Analysis (JHA) is a method for identifying potential hazards that focuses on job duties or job descriptions
as a way to identify hazards before they occur. After planning the Construction OHS, it can be calculated the budget required for the implementation of the Construction OHS. In this Applied Final Project the author plans a Construction OHS (Occupational Safety and Health Management System) using the Job Hazard Analysis (JHA) method with a case study on the East Outer Ring Road Surabaya (OERR) Construction Project Segment 1 Work (Sta 0+000 S/D) Sta 0+875) Left Side Frontage with limitations on pile work,
pile head work and full slab work. From the planning of the a Construction OHS (Occupational Safety and Health Management System), 26 hazards that may occ tools/materials. From this assessment, many of the identified hazards have a moderate level of risk. From this plan, a budget plan of Rp. 476,511,003 was also obtained for the implementation of Construction OHS.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Construction OHS, JHA, Cost Budget, OERR
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Nur Ubaidillah Ubadah
Date Deposited: 31 Aug 2021 05:04
Last Modified: 24 Sep 2024 02:41
URI: http://repository.its.ac.id/id/eprint/90793

Actions (login required)

View Item View Item