Pengambilan Keputusan Penggunaan Lahan di Jalan Gatot Subroto Kota Tangerang Menggunakan Analytic Network Process Berdasarkan Kriteria Highest and Best Use

Yogananda, Nabilla (2022) Pengambilan Keputusan Penggunaan Lahan di Jalan Gatot Subroto Kota Tangerang Menggunakan Analytic Network Process Berdasarkan Kriteria Highest and Best Use. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211950023021-Master_Thesis.pdf] Text
09211950023021-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2024.

Download (3MB) | Request a copy

Abstract

Alih fungsi lahan baiknya menghasilkan nilai lahan atau lahan beserta bangunan yang produktif. Lahan seluas 4003 m2 milik swasta yang berlokasi di Jalan Gatot Subroto Kota Tangerang tidak termanfaatkan akibat beberapa hambatan. Lahan tersebut berada dalam kawasan berkembang yang dikelilingi oleh properti komersial maupun non-komersial. Oleh karena itu, dilakukan analisis Highest and Best Use (HBU) pada penelitian sebelumnya pada objek tersebut hingga diperoleh produktivitas maksimum penggunaan lahan.
Namun HBU merupakan penilaian subjektif dimana pada dasarnya tidak mampu mengakomodasi pengambilan keputusan oleh para stakeholder didalamnya. Maka perlu dilanjutkan mengenai pengambilan keputusan dengan mempertimbangkan penilaian stakeholder dan keterkaitan antar kriteria menggunakan metode Analytic Network Process (ANP). Metode pengumpulan data dilakukan untuk analisa beberapa alternatif yaitu dengan cara pengumpulan data dari stakeholder luar. Adapun stakeholder terpilih berjumlah 2 orang, yaitu DPUPR Kota Tangerang, dan konsultan pengembangan properti. Analisis data dilakukan untuk mencari prioritas tertinggi yang dihasilkan dari analisa ANP berdasarkan kriteria HBU yang meliputi aspek legal, aspek fisik, aspek finansial, produktivitas maksimum, dan masing-masing pengukurannya. Berdasarkan analisis yang dilakukan, alternatif dengan prioritas akhir tertinggi adalah apartemen dengan bobot 0,477, kemudian dilanjutkan pusat perbelanjaan dengan bobot 0,453, dan pergudangan dengan bobot 0,070.
================================================================================================
The land conversion should produce productive land value or productive land along with the building. The 4003 m2 land privately owned, located on Jalan Gatot Subroto, Tangerang City is not utilized due to some obstacles. The land is located in a growing area surrounded by commercial and non-commercial properties. Therefore, Highest and Best Use (HBU) analysis was carried out on previous research on the object until maximum land use productivity was obtained.
However, HBU is a subjective assessment that is basically unable to accommodate decision making by stakeholders in it. However, it is necessary to continue regarding decision making by considering stakeholder assessment and interrelationship between criteria using Analytic Network Process (ANP) method. Data collection methods are carried out for the analysis of several alternatives, namely by collecting data from outside stakeholders. The selected stakeholders amounted to 2 people, namely DPUPR Tangerang City, and property development consultants. Data analysis is conducted to find the highest priority resulting from ANP analysis based on HBU criteria covering legal aspects, physical aspects, financial aspects, maximum productivity, and each measurement. Based on the analysis conducted, the alternative with the highest final priority is the apartment with a weight of 0.477, then continued shopping centers with a weight of 0.453, and warehousing with a weight of 0.070.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Lahan, Highest and Best Use (HBU), Pengambilan Keputusan, Analytic Network Process (ANP), Land, Highest and Best Use (HBU), Decision Making, Analytic Network Process (ANP)
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis
Depositing User: Nabilla Yogananda
Date Deposited: 12 Jan 2022 08:35
Last Modified: 12 Jan 2022 08:35
URI: http://repository.its.ac.id/id/eprint/92245

Actions (login required)

View Item View Item