Rasyidi, Fikri hanif (2021) Evaluasi dan Studi Rancangan Header Pompa Unit Produksi Wendit 2 dalam Rangka Peningkatan Efisiensi Energi di Perumda Air Minum Tugu Tirta Kota Malang. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
06014201037-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2024. Download (3MB) | Request a copy |
Abstract
Berdasarkan Laporan Bulanan Bagian Produksi untuk bulan Juli 2021 konsumsi pemakaian listrik di Unit Produksi Wendit 2 sebesar 456.280 Kwh dengan tagihan rekening listrik sebesar Rp 527.056.917,- dan Jumlah produksi air sebesar 781.947 m3. Dari data tersebut dapat diperoleh bahwa biaya energi produksi sangat tinggi yakni sebesar Rp 674/m3 dengan nilai Spesific Energi Consumption (SEC) 0,584. Oleh karena itu perlu dilakukan identifikasi masalah intensitas dan kinerja penggunaan energi dengan melakukan audit energi pada Unit Produksi Wendit 2.
Penelitian ini akan memberikan gambaran terhadap kondisi sistem kelistrikan dan konfigurasi header pompa Unit Produksi Wendit 2. Melakukan evaluasi terhadap kondisi-kondisi tersebut untuk dapat menganalisis dalam parameter energi listrik dan hidrolis sehingga dapat dilakukan perbaikan pada sistem eksisting untuk menurunkan konsumsi energi listrik dan meningkatkan jumlah air yang diproduksi dengan pemilihan pemasangan blind valve pada header pompa atau dengan pemasangan header pompa yang baru.
Berdasarkan hasil audit energi pada panel pompa Unit Produksi Wendit 2 dapat disimpulkan bahwa nilai efisiensi pompa dan nilai SEC dari masing-masing pompa masih dikategorikan efisien, faktor penyebab tidak efisien-nya Unit Produksi Wendit 2 terjadi pada header pompa eksisting dengan konfigurasi fitting tee 900 dan memiliki 2 outlet header menuju reservoir Buring dan reservoir Mojolangu. Hasil penelitian menunjukkan bahwa rancangan header pompa Alternatif 3 dengan 4 pompa disusun paralel membentuk sudut 450 dengan 1 outlet header adalah pemilihan rekomendasi terbaik dalam rangka peningkatan efisiensi energi dengan menurunkan biaya energi produksi menjadi Rp 476/m3.
=====================================================================================================
Based on the Production Division Monthly Report for July 2021, electricity consumption in Wendit 2 Production Unit is 456,280 Kwh with an electricity bill of Rp. 527,056,917,- and total water production is 781,947 m3. From these data, it can be seen that the energy cost of production is very high, namely Rp. 674/m3 with a Specific Energy Consumption (SEC) value of 0.584. Therefore, it is necessary to identify the problem of intensity and performance of energy use by conducting an energy audit at the Wendit 2 Production Unit.
This study will provide an overview of the condition of the electrical system and the configuration of the pump header of the Wendit 2 Production Unit. Evaluating these conditions to be able to analyze the electrical and hydraulic energy parameters so that improvements can be made to the existing system to reduce electrical energy consumption and increase the amount of water produced by selecting a blind valve installation on the pump header or by installing a new pump header.
Based on the results of the energy audit at the Wendit 2 Production Unit, it can be concluded that the pump efficiency value and the SEC value of each pump are still categorized as efficient, the factor causing the inefficient occurred in the pump header of the existing Wendit 2 Production Unit with a tee-90 fitting configuration and has 2 header outlets leading to the Buring reservoir. and the Mojolangu reservoir. The results showed that the design of Alternative 3 pump headers with 4 pumps arranged in parallel forming an angle of 450 with 1 header outlet was the best recommendation selection in order to increase energy efficiency by reducing production energy costs to Rp 476/m3.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Audit Energi, Efisiensi Energi, Efisiensi Produksi, Header Pompa,Energy Audit, Energy Efficiency, Production Efficiency, Pump Header |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems T Technology > TJ Mechanical engineering and machinery > TJ903 Pumping machinery. T Technology > TJ Mechanical engineering and machinery > TJ935 Pipe--Fluid dynamics. Tubes--Fluid dynamics |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25101-(S2) Master Thesis |
Depositing User: | Fikri Hanif Rasyidi |
Date Deposited: | 14 Jan 2022 03:02 |
Last Modified: | 14 Jan 2022 03:02 |
URI: | http://repository.its.ac.id/id/eprint/92274 |
Actions (login required)
View Item |