Laporan Kerja Praktek “ Proyek Pembangunan Gedung Akuntansi Dan Administrasi Niaga Tahap 1 Politeknik Negeri Malang ”

Aulia, Putri Dwi Zahrotul (2021) Laporan Kerja Praktek “ Proyek Pembangunan Gedung Akuntansi Dan Administrasi Niaga Tahap 1 Politeknik Negeri Malang ”. Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111840000030-Project_Report.pdf]
Preview
Text
03111840000030-Project_Report.pdf - Accepted Version

Download (6MB) | Preview

Abstract

Program studi S1 Teknik Sipil, Departemen Teknik Sipil FTSPK
menyediakan mata kuliah Kerja Praktik yang memfasilitasi mahasiswanya untuk bisa turun langsung merasakan kondisi pekerjaan di lapangan. Dengan adanya mata kuliah ini diharapkan mahasiswa mampu memperluas wawasannya mengenai
penerapan ilmu keteknik-sipilan di lapangan, sistem manajemen proyek, dan K3 yang sebelumnya hanya didapat dari perkuliahan saja. Selain itu dengan pelaksanaan kerja praktik ini diharapakan mahasiswa dapat memperoleh
pengetahuan dan pengalaman kerja yang dapat menjadi bekal saat menghadapi dunia pekerjaan. Sehingga mahasiswa menjadi sumber daya manusia yang dapat menjawab permasalahan yang ada pada masyarakat di kedepannya.
Oleh karena itu, Proyek Pembangunan Gedung Kuliah Politeknik Negeri Malang Jurusan Akutansi/Administrasi Niaga Tahap 1 yang dilaksanakan oleh PT. Fadil Rahma Samodra yang menjadi tempat pelaksanaan kegiatan Kerja Praktik dan telah dilaksanakan selama 2 bulan (40 - 48 jam per pekan).
====================================================================================================
Civil Engineering Undergraduate Study Program, Civil Engineering Department FTSPK
provides practical work courses that facilitate students to be able to directly experience working conditions in the field. With this course, students are expected to be able to broaden their horizons regarding the application of civil-engineering science in the field, project management systems, and K3 which were previously only obtained from lectures. In addition, with the implementation of this practical work, it is hoped that students can gain knowledge and work experience that can be a provision when facing the world of work. So that students become human resources who can answer the problems that exist in society in the future.
Therefore, the Construction Project of the State Polytechnic Lecture Building of Malang Department of Accounting/Commerce Administration Phase 1 carried out by PT. Fadil Rahma Samodra which is the place for the implementation of the Practical Work activities and has been carried out for 2 months (40 - 48 hours per week).

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Perencanaan, Struktur Bawah, Struktur Atas, Kesehatan dan Keselamatan Kerja dan Lingkungan (K3L)
Subjects: N Fine Arts > NA Architecture > NA6600 Education buildings
T Technology > TH Building construction
T Technology > TH Building construction > TH1461 Concrete construction.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Putri Dwi Zahrotul Aulia
Date Deposited: 19 Jan 2022 05:55
Last Modified: 19 Jan 2022 05:55
URI: http://repository.its.ac.id/id/eprint/92377

Actions (login required)

View Item View Item