Pamungkas, Triasco Handyan and Sanie, Mahdan Kintara (2021) Laporan Kerja Praktik Proyek Pembangunan Gedung Pusat Pengujian Dan Pengembangan Inovasi (P3I) Universitas Gajah Mada PT. Adhi Karya (Persero) Tbk. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
03111840000122_03111840000138-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (5MB) | Request a copy |
Abstract
Universitas Gajah Mada dalam waktu yang hampir bersamaan membangun 10 bangunan gedung baru. Kepengurusan universitas di era saat ini tengah gencar melakukan pembangunan secara masif. Dalam beberapa tahun kedepan tercatat sebanyak 30-an pembangunan akan dilakukan secara serentak, dan di areal klaster kesehatan sendiri saat ini tengah berlangsung salah satunya gedung P3I UGM. Kerja Praktik yang dilaksanakan sejak 12 Juli s/d 20 September 2021 pada proyek Pembangunan gedung P3I ini terdapat 2 gedung, Gedung A yang akan dibangun 4 lantai 1 basement dengan luas 7.965 meter persegi dan Gedung B yang akan dibangun 2 Lantai 1 Basement dengan luas 3.009 meter persegi. Dengan pembangunan dan perbaikan beberapa infrastruktur di Fakultas Farmasi UGM ini akan menunjang peningkatan akademik dan non akademik.
====================================================================================================
Gajah Mada University at almost the same time built 10 new buildings. UGM in the current era is intensively carrying out massive development. In the next few years, it is recorded that around 30 developments will be carried out simultaneously, and in the health cluster area itself, one of them is the UGM P3I building. Practical work, which was carried out from July 12 to September 20 2021, took place in a P3I building construction project, there are 2 buildings, Building A which will be built 4 floors 1 basement with an area of 7,965 square meters and Building B which will be built 2 floors 1 Basement with an area of 3,009 square meter. With the construction and improvement of several infrastructures at the UGM Faculty of Pharmacy, it will support academic improvement and non academic.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Universitas Gajah Mada, P3I UGM, Kerja Praktik, Struktur, Gedung, Baja, Beton. ============================================================ Gajah Mada University, P3I UGM, Practical Work, Structure, Buildings, Steel, Concrete. |
Subjects: | N Fine Arts > NA Architecture > NA6600 Education buildings T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction T Technology > TH Building construction |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Triasco Handyan Pamungkas |
Date Deposited: | 19 Jan 2022 06:18 |
Last Modified: | 10 Apr 2023 01:54 |
URI: | http://repository.its.ac.id/id/eprint/92385 |
Actions (login required)
View Item |