Yunanto, Nurcahyo (2022) Optimasi Desain Jaringan Listrik Pada Floating Production Unit Di Selat Makassar. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
07111540000077_Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2024. Download (2MB) | Request a copy |
Abstract
Floating Production Unit (FPU) adalah bangunan lepas pantai
yang mengapung dikarenakan kedalaman laut. Floating Production Unit membutuhkan listrik sebagai sumber utama pengoperasian mesin mesin yang ada. Dengan meningkatnya kebutuhan listrik pada FPU menyebabkan desain jaringan listriknya semakin kompleks dan mahal. Sehingga dibutuhkan optimasi desain jaringan listrik, agar beban dan tata ruang yang digunakan pada Floating Production Unit menjadi lebih
efisien. Beberapa cara yang dapat dilakukan untuk mengoptimasi suatu jaringan listrik pada FPU adalah dengan mengurangi bagian tembaga pada semua busbars dan mutualize spare transformer. Dengan mengurangi bagian tembaga pada semua busbars dapat mengurangi kebutuhan ruang untuk busbars dan mengurangi penampang kabel. Dan mutualize spare transformer dilakukan agar kebutuhan transformer menjadi lebih sedikit sehingga dapan mengurangi beban dan kebutuhan ruang unnk transformer itu sendiri. Sehingga tujuan dari optimasi itu sendiri agar dapat mengurangi beban dan mengurangi kebutuhan ruang yang nantinya akan mempengaruhi biaya dalam pembuatan FPU. Penerapannya akan dilakukan pada sebuah FPU di selat Makassar. Setelah itu akan dilakukan pengujian analisis aliran daya dan analisis hubung singkat dengan menggunakan software ETAP. Pengujian dilakukan agar membuktikan optimasi desain jaringan listrik pada FPU tetap dapat berjalan seperti semula. Lalu akan dibandingkan jaringan listrik yang telah teroptimasi dengan jaringan listrik yang semula, agar mengetahui seberapa besar pengaruh optimasi yang telah dilakukan terhadap beban dan kebutuhan ruang pada FPU di selat Makassar.
================================================================================================
A floating Production Unit (FPU) is a vessel floating in the depth of an offshore. FPU requires a series of electric
configurations to support the operations of all kinds of machinery within the unit. A surge in electrical usage of the unit would result in a more complex electrical network also an increase in cost. Thus, an optimization of the electrical network is needed to reduce the load and layouts within the unit to create a more cost-efficient FPU. There are several ways to optimize an electrical network in an FPU, two of which are by reducing copper material in all busbars and mutualizing a spare transformer. First of all, reducing copper material in busbars would cut the space and cable cross-section. Secondly, mutualizing a spare transformer would reduce the space required by a larger transformer. This theory is applied to an FPU in Makassar Strait. A load flow analysis and a simple associative analysis are done using ETAP software. The methods are tested to apply the electrical network optimization towards a real FPU unit and to prove the effectiveness of the optimization towards a more cost-effective FPU unit in Makassar Strait.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Optimasi, Desain Jaringan Listrik, Floating Production Unit, Selat Makassar, Optimization, Electrical Network, Makassar Strait |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2551 Electric transformers. T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems |
Divisions: | Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis |
Depositing User: | Nurcahyo Yunanto |
Date Deposited: | 03 Feb 2022 07:43 |
Last Modified: | 03 Feb 2022 07:43 |
URI: | http://repository.its.ac.id/id/eprint/92718 |
Actions (login required)
View Item |