Desain Kapal Pengangkut dan Pemilah Sampah untuk Operasional di Hilir Sungai Ciliwung,DKI Jakarta

Aji, Cahya Imanuddin (2022) Desain Kapal Pengangkut dan Pemilah Sampah untuk Operasional di Hilir Sungai Ciliwung,DKI Jakarta. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of Laporan Tugas Akhir_Cahya Imanuddin Aji_04111_04111840000008.pdf] Text
Laporan Tugas Akhir_Cahya Imanuddin Aji_04111_04111840000008.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (10MB) | Request a copy

Abstract

Dalam UU No. 32 Tahun 2009 tentang Perlindungan dan Pengelolaan Lingkungan Hidup dapat diketahui bahwa salah satu penyebab terjadinya pencemaran lingkungan adalah sampah. Sungai adalah salah satu lingkungan yang sering mengalami pencemaran. Sungai Ciliwung yang terletak di Bogor hingga DKI Jakarta menjadi salah satu penyebab terjadinya banjir di DKI Jakarta ketika musim hujan. Hal tersebut dikarenakan banyaknya penduduk di sekitar pinggiran sungai yang masih membuang sampah rumah tangga ke dalam aliran sungai. Hal tersebut mengakibatkan penumpukan sampah menyebabkan aliran sungai menjadi tidak lancar. Oleh karena itu didesain kapal pengangkut dan pemilah sampah yang dapat memberikan kemudahan dalam melakukan operasional pengangkutan dan pemilahan sampah di daerah aliran sungai (DAS) Ciliwung. Penulis mendapatkan data terkait jumlah sampah yang ada di aliran Sungai Ciliwung tahun 2018 hingga 2021 dari Unit Pelaksana Kebersihan Badan Air DKI Jakarta. Jumlah volume sampah di Sungai Ciliwung tepatnya di Pintu Air Manggarai hingga Pintu Air Karet dari tahun 2018 hingga 2021 berturut-turut adalah sebagai berikut : 21,37 m³, 25,52 m³, 22,16 m³, 28,24 m³. Penelitian ini bertujuan untuk menghasilkan desain kapal pengangkut sampah dengan mesin pemilah sampah di dalamnya. Sehingga kondisi akhir sampah yang diangkut telah terpilah antara sampah organik dengan sampah non-organik. Kapal ini menggunakan conveyor untuk proses loading dan unloading sampah. Setelah dilakukan perhitungan, didapatkan payload untuk kapal ini sebesar 9,5 m3. Hasil perhitungan analisis teknis dari kapal pengangkut dan pemilah sampah diperoleh ukuran utama sebesar Loa = 12,4 m; B= 7 m; B1 = 1,8 m; H= 1,8 m; T= 0,8; dan kecepatan sebesar 5 Knot. Setelah ukuran utama diperoleh, dilakukan pembuatan Gambar Rencana Garis, Gambar Rencana Umum, Model 3D, dan perhitungan biaya pembangunan sebesar Rp 1.398.761.820 serta biaya operasional kapal sebesar Rp 252.921.124 per tahun.
================================================================================================
In Law no. 32 of 2009 concerning Environmental Protection and Management, it can be seen
that one of the causes of environmental pollution is waste. Rivers are one of the most polluted
environments. The Ciliwung River which is located in Bogor to DKI Jakarta is one of the causes
of flooding in DKI Jakarta during the rainy season. This is due to the large number of residents
around the riverbanks who still throw household waste into the river. This results in the
accumulation of garbage causing river flow to be not smooth. Therefore, a ship that transports
and sorts waste is designed to provide convenience in carrying out the operation of transporting
and sorting waste in the Ciliwung watershed (DAS). The author obtained data regarding the
amount of waste in the Ciliwung River from 2018 to 2021 from the DKI Jakarta Water Agency
Technical Implementation Unit. The total volume of waste in the Ciliwung River, precisely at
the Manggarai Sluice to the Karet Sluice from 2018 to 2021, respectively, is as follows: 21,37
m³, 25,52 m³, 22,16 m³, 28,24 m³. This study aims to produce a design for a garbage transport
ship with a garbage sorting machine in it. So that the final condition of the transported waste
has been separated between organic waste and non-organic waste. This ship uses a conveyor
for the process of loading and unloading garbage. After calculating, the payload for this ship is
9,5 m³. The results of the calculation of the technical analysis of the ship transporting and
sorting waste obtained the main size of Loa = 12,4 m; B= 7 m; B1 = 1,8 m; H= 1,8 m; T= 0,8;
and a speed of 5 knots. After the main dimensions have been obtained, the Linesplan, General
Arrangement, 3D Model with a building cost of Rp. 1.398.761.820, and operational costs of Rp
252.921.124 per year.

Item Type: Thesis (Other)
Uncontrolled Keywords: Trash skimmer, Sorter, Trash, Ciliwung River
Subjects: V Naval Science > V Naval Science (General)
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM297 Ships Designs and drawings
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM311 Catamarans.
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Cahya Imanuddin Aji
Date Deposited: 07 Feb 2022 05:11
Last Modified: 31 Oct 2022 01:40
URI: http://repository.its.ac.id/id/eprint/92937

Actions (login required)

View Item View Item