Soares, Melqui de Jesus (2022) Analisis Jaringan Kerja Pada Persiapan Pengiriman Petikemas Dari Surabaya Ke Timor-Leste Dengan Menggunakan Metode PERT Dan CPM. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
06111740007004-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2024. Download (2MB) | Request a copy |
Abstract
Dalam penelitian ini dibahas tentang persiapan pengiriman Petikemas dari pelabuhan Tanjung Perak Surabaya ke pelabuhan Dili Timor-Leste. Di dalam proses pengiriman ini hanya membahas tentang proses pengangkutan Petikemas dari darat ke atas kapal. Di dalam proses pengangkutan Petikemas dari darat ke kapal ini melibatkan beberapa hal yaitu SDM (Sumber Daya Manusia), diantaranya adalah operator gantry crane, operator tired gantry, operator fork lift, operator haulage head truck, kuli, dan peralatan yang di pakai berupa katrol, gantry crane, tired gantry, fork lift, dan haulage head truck. Pada penelitian ini, dilakukan analisis jaringan kerja pada kegiatan persiapan pengiriman Petikemas dengan menggunakan metode CPM (Critical Path Method) untuk mengetahui kegiatan-kegiatan yang berada di lintasan kritis, dan PERT (Program Evaluation and Review Technique) untuk mereview persiapan pengiriman Petikemas dapat diselesaikan tepat waktu. Berdasarkan analisis yang dilakukan, diperoleh bahwa durasi kegiatan kritisnya adalah 32 Jam. Sedangkan dengan menggunakan metode PERT diperoleh bahwa kegiatan persiapan pengiriman dapat dipercepat dengan peluang percepatan sebesar 20%.
================================================================================================
This study discusses the preparation of container shipments from the Tanjung Perak port of Surabaya to the Dili port of Timor-Leste. This shipping process only discusses the process of transporting containers from land to ship. The process of transporting containers from land to ships involves several things, namely HR (Human Resources), including gantry crane operators, tired gantry operators, fork lift operators, haulage head truck operators, coolies, and the equipment used in the form of pulleys, gantry cranes, tired gantry, fork lifts, and haulage head trucks. In this study, network analysis was carried out on container delivery preparation activities using the CPM (Critical Path Method) method to find out which activities were on the critical trajectory, and PERT (Program Evaluation and Review Technique) to review the preparation of container delivery can be completed on time. time. Based on the analysis, it was found that the duration of the critical activity was 32 hours. Meanwhile, by using the PERT method, it is found that the preparation of delivery activities can be accelerated with an acceleration opportunity of 20%.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Jaringan Kerja, PERT, CPM, Timor-Leste, Network |
Subjects: | Q Science > QA Mathematics > QA401 Mathematical models. |
Divisions: | Faculty of Science and Data Analytics (SCIENTICS) > Mathematics > 44201-(S1) Undergraduate Thesis |
Depositing User: | Melqui de Jesus Soares |
Date Deposited: | 09 Feb 2022 01:40 |
Last Modified: | 02 Nov 2022 03:44 |
URI: | http://repository.its.ac.id/id/eprint/93284 |
Actions (login required)
View Item |