Analisis Risiko Proyek Penggantian Transformer Dan Cos (Change Over Switch) Terhadap Kontinuitas Produksi Dengan Menggunakan Metode Hirarc (Hazard Identification, Risk Assessment And Risk Control) Pada PT. XYZ

Rachmatullah, Novandita (2022) Analisis Risiko Proyek Penggantian Transformer Dan Cos (Change Over Switch) Terhadap Kontinuitas Produksi Dengan Menggunakan Metode Hirarc (Hazard Identification, Risk Assessment And Risk Control) Pada PT. XYZ. Masters thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 09211950024032-Master_Thesis.pdf] Text
09211950024032-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (2MB) | Request a copy

Abstract

PT. Quadro adalah kontraktor yang bergerak dibidang mechanical dan electrical
engineering yang bekerja sama dengan PT. XYZ yang meliputi maintenance and repair alat
tenaga listrik dan power plant untuk menyuplai produksi di PT. XYZ. Untuk menjamin
kelangsungan produksi, dilakukan project maintenance dan repair jaringan Tegangan Ekstra
Menengah (<1000VAC). Hal yang dilakukan adalah penggantian trafo distribusi 20KV
(3500KVA) dikarenakan usia trafo sudah melampaui batas maksimum pemakaian, sehingga
kapasitas trafo tidak maksimal. Selain itu juga adanya pelaksanaan ATS (Automatic Transfer
Switch) yang mengubah COS (change over switch) manual menjadi COS automatic.
Pekerjaan poyek tersebut mempunyai tingkat risiko yang tinggi. Sesuai dengan standart
PERMEN no 1 tahun 1970 mengenai K3L, perlu diberlakukan pemadaman aliran listrik
untuk menjamin keselamatan dalam proses penggantian. Hal ini akan berdampak kerugian
pada kontinuitas produksi PT XYZ dikarenakan listrik mati sehingga dapat mempengaruhi
kontinuitas produksinya. Penelitian ini bertujuan untuk menentukan tindakan apa yang harus
dilakukan untuk meminimalisir risiko yang bakal terjadi apabila proses penggantian
dilakukan tanpa adanya pemadaman atau dilakukan perencanaan yang lebih detil untuk
proses yang beresiko sangat tinggi. Analisis risiko dilakukan menggunakan HIRARC
(Hazard Identification, Risk Assessment and Risk Control).
Hasil penelitian menunjukkan bahwa pada produk A ketika terjadi pemadaman
listrik 18-24 jam untuk penggantian trafo dan COS ditemukan 9 resiko kerugian dengan 8
resiko sedang dan 1 resiko rendah. Pada produk Bditemukan 18 resiko kerugian dengan 1
resiko tinggi, 6 resiko sedang, 10 resiko rendah dan 1 resiko sangat rendah. Pada produk C
ditemukan 13 risiko kerugian dengan 4 resiko sedang, 3 resiko rendah dan 5 resiko sangat
rendah. Pada produk WWTP ditemukan 3 resiko kerugian dengan 1 resiko tinggi dan 2
resiko rendah. Berdasarkan tiap resiko yang ada perlu dilakukan pengendalian risiko
pengendalian dan penurunan resiko pada semua risiko yang ada. Penurunan risiko
diharapkan akan menurunkan risiko dari kategori high risk menjadi low risk. Penurunan
risiko difokuskan pada risiko utama pada produk B dan WWTP dengan melakukan
pengendalian resiko berupa AC harus tetap ON, power harus full dan komunikasikan adanya
info pemadaman listrik yang dilakukan 2 hari sebelumnya agar bisa dipersiapkan solusinya
yang akan dilakukan saat terjadi pemadaman listrik.
Kata kunci: risiko, risk register, kontinuitas produksi, HIRARC, industry
=====================================================================================================
PT. Quadro is a contractor company focused in mechanical and electrical
engineering which collaboration with PT. XYZ, includes maintenance and repair of electric
power tools and power plants to supply production at PT. XYZ. To ensure continuity of
production, a maintenance and repair project for the Extra Medium Voltage (<1000VAC)
system is carried out. Aims to replace the distribution transformer 20KV (3500KVA) because
the transformer age has exceeded the maximum usage limit, so that the transformer capacity
is not optimal. In addition, there is also the implementation of ATS (Automatic Transfer
Switch) which changes manual COS (change over switch) to automatic COS. The project has
a high level of risk. In accordance with the standard PERMEN No.1 of 1970 concerning
OHSE, it is necessary to apply a power outage to ensure safety in process of replacement.
The replacement process will have an impact on the continuity of production of PT XYZ due
to power outages so that it can affect the continuity of its production. This study aims to
determine what actions should be taken to minimize the risks that will occur if the
replacement process is carried out without any power outages or a more detailed planning
is carried out for a very high risk process. Risk analysis was carried out using HIRARC
(Hazard Identification, Risk Assessment and Risk Control.
The results showed that the product Asaat 18-24 hour power outage for transformer
replacement and COS found 9 risks of loss with 8 moderate risk and 1 low risk. In product
B, 18 risks of loss were found with 1 high risk, 6 moderate risk, 10 low risk and 1 very low
risk. In product C found 13 risks of loss with 4 moderate risk, 3 low risk and 5 very low risk.
In WWTP products found 3 risks of loss with 1 high risk and 2 low risk. Based on each
existing risk, it is necessary to control risk control and reduce risk on all existing risks.
Reducing risk is expected to reduce risk from the high risk category to low risk. Risk
reduction is focused on the main risks in product B and WWTP by controlling risks in the
form of AC must remain ON, power must be full and communicate information about power
outages that were carried out 2 days earlier so that solutions can be prepared that will be
carried out in the event of a power outage.
Keywords: Risk, risk register, continuity production, HIRARC, industry

Item Type: Thesis (Masters)
Uncontrolled Keywords: manajemen risiko, risk register, kontinuitas produksi, HIRARC, industri pangan risk management, risk register, continuity production, HIRARC, food industry
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: Novandita Rachmatullah
Date Deposited: 11 Feb 2022 00:36
Last Modified: 11 Feb 2022 00:36
URI: http://repository.its.ac.id/id/eprint/93717

Actions (login required)

View Item View Item