Budiman, Gilang Arif (2022) Analisis Reliability Dan Cost Preventive Maintenance Pada Pembangkit Listrik Tenaga Surya di PLTH Pantai Baru Pandansimo, Bantul, Yogyakarta. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
02311640000106-Undergraduate_Thesis.pdf - Accepted Version Download (4MB) | Preview |
Abstract
Dengan keterbatasan sumber daya energi minyak bumi, menuntut para peneliti untuk
menemukan alternatif energi yang terbarukan dan berkelanjutan, energi matahari adalah
salah satu solusi terbaik dalam memenuhi kebutuhan manusia akan energi, dalam menjaga
keandalan dari pembangkit listrik tenaga surya diperlukan analisis perawatan yang dilakukan
secara berkala, langkah awal dari analisis perawatan ini adalah dilakukan pengumpulan serta
pengolahan data dalam hal ini menggunakan grafik kontrol dari hasil daya yang dikeluarkan
oleh panel surya, dari hasil olah data tersebut lalu mencari nilai reliability, serta biaya
preventive maintenance. Berdasarkan penelitian yang telah dilakukan didapatkan nilai
reliability komponen PV 48V sebesar 0.6 dalam waktu 5 hari sedangkan untuk komponen
PV 240V sebesar 0.6 dalam waktu 6 hari, nilai keandalan dengan menggunakan preventive
maintenance didapatkan penjadwalan maintenance dengan interval waktu 6 hari untuk PV
48 V dan 7 hari untuk PV 240 V, sedangkan untuk analisis biaya preventive maintenance
didapatkan Rp893,119 untuk PV 48 V dan Rp746,251 untuk PV 240 V selama satu tahun
dan hanya berlaku untuk 1 pekerja.
================================================================================================
With limited of petroleum energy resources, researchers are tend to find renewable and
sustainable energy alternatives, solar energy is one of the best solutions for humankind to
fulfil their needs of energy, to maintaining the reliability of solar power plants, periodic
maintenance analysis is required, the first step to do maintenance analysis is collect and
process the data, in this case is using a control chart of the power output from the solar
panel, from the results of the data processing, then the value of reliability, as well as the cost
of preventive maintenance are calculated. Based on the research that has been conducted
found that the reliability value of PV 48V components is 0.6 for 5 days while for PV 240V
components is 0.6 for 6 days, reliability value using preventive maintenance obtained
maintenance scheduling with time intervals of 6 days for PV 48 V and 7 days for PV 240 V,
while the costs analysis of preventive maintenance obtained Rp.893,119 for PV 48 V and
Rp.746,251 for PV 240 V for a year and is only valid for 1 worker.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Reliability, Preventive maintenance, panel surya, grafik kontrol Reliability, Preventive maintenance, Solar Panel, Control Chart |
Subjects: | T Technology > TS Manufactures > TS174 Maintainability (Engineering) . Reliability (Engineering) |
Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Physics Engineering > 30201-(S1) Undergraduate Thesis |
Depositing User: | Gilang Arif Budiman |
Date Deposited: | 13 Apr 2022 03:49 |
Last Modified: | 30 Oct 2024 06:07 |
URI: | http://repository.its.ac.id/id/eprint/94885 |
Actions (login required)
View Item |