Studi Kelayakan Pemasangan Plts Berkapasitas 1800 Kwp Di Kelistrikan Power Plant Majalengka Factory Pt Wijaya Karya Industri Dan Konstruksi

Putra, Arian Bawana (2022) Studi Kelayakan Pemasangan Plts Berkapasitas 1800 Kwp Di Kelistrikan Power Plant Majalengka Factory Pt Wijaya Karya Industri Dan Konstruksi. Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 07111840000010-Undergraduate_Thesis.pdf] Text
07111840000010-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2024.

Download (4MB)

Abstract

Perkembangan teknologi pembangkitan listrik semakin umum untuk digunakan, terlebih lagi yang paling mudah dan fleksibel dalam pembuatannya yakni pembangkit listrik tenaga surya. Bukti dari fleksibilitasnya yakni mulai maraknya green power plant yang menggunakan sel surya di negara-negara maju. Untuk memenuhi kebutuhan beban yang digunakan di industri. PT Wijaya Karya Industri & Konstruksi (WIKON), Majalengka Factory telah memulai langkah dekarbonisasi, langkah yang ditempuh guna mempercepat dekarbonisasi yakni pembangunan pembangkit energi berbasis energi terbaru dan terbarukan. PLTS yang akan dibangun yakni sebagai pemenuh konsumsi daya privat Majalengka Factory. Namun sebelum pembangunan proyek tersebut perlu dilakukan terlebih dahulu tinjauan kelayakan proyeknya. Oleh karena itu pada Tugas Akhir ini dibahas mengenai studi kelayakan pemasangan PLTS berkapasitas sebesar 1800 kWp pada kelistrikan existing pada power plant Majalengka Factory milik PT Wijaya Karya Industri & Konstruksi (WIKON) dengan memperhatikan potensi energi tahunan berdasarkan lahan yang tersedia, analisis tilt angle yang paling optimal, analisis arah hadap panel yang paling optimal, analisis pemilihan teknologi panel surya yang paling optimal, dan dilakukan pula pembanding investasi apabila sepenuhnya menggunakan daya dari grid. Analisis investasi juga dilakukan untuk menilai kelayakan proyek ini dengan analisis apabila proyek dibangun tanpa menggunakan pinjaman dari bank dan menggunakan pinjaman dari bank
========================================================================================================================================
The development of electricity generation technology is increasingly more common to use, especially solar power plant, the easiest and most flexible in its manufacture. The proof of its flexibility is that green power plants that use of solar cells are starting to spread in developed countries. To meet the needs of loads used in industry. PT Wijaya Karya Industri & Construction (WIKON), Majalengka Factory has started decarbonization steps, steps taken to accelerate decarbonization, namely the construction of energy plants based on the latest and renewable energy. The solar power plant to be built is to fulfill the private power consumption of Majalengka Factory. However, prior to the construction of the project, it is necessary to conduct a feasibility review of the project. Therefore, this final project discusses the feasibility study of installing solar power plant with capacity of 1800 kWp on existing electricity at the Majalengka Factory power plant owned by PT Wijaya Karya Industri & Konstruksi (WIKON) by taking into account the annual energy potential based on available land, the most optimal tilt angle analysis, analysis of the panel direction towards the most optimal, analysis of the selection of the most optimal solar panel technology, and comparison of investments when fully using power from the grid. Investment analysis is also carried out to assess the feasibility of this project by analyzing if the project is built without using loan from bank and using loan from bank

Item Type: Thesis (Other)
Additional Information: RSE 621.312 44 Put s-1
Uncontrolled Keywords: Analisis Investasi, On-Grid PV, Renewable Energy
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ810.5 Solar energy
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1056 Solar powerplants
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 06 Dec 2022 06:55
Last Modified: 06 Dec 2022 06:55
URI: http://repository.its.ac.id/id/eprint/95164

Actions (login required)

View Item View Item