Firdausi, Naura (2022) Model Penilaian Keberlanjutan Sosial Pada Pekerja Lapangan Proyek Konstruksi. Masters thesis, Institut Teknologi Sepuluh Nopember Surabaya.
Text
6012201057-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 September 2024. Download (3MB) | Request a copy |
Abstract
Prinsip pembangunan berkelanjutan untuk memberikan manfaat dari segi aspek ekonomi, sosial, dan lingkungan. Karakteristik aspek sosial suatu proyek memiliki tingkat ketidakpastian yang tinggi. Keterlibatan dalam implementasi keberlanjutan sosial bengantung pada interaksi disetiap pemangku kepentingan (Stakeholder). Salah satu stakeholder yang terlibat adalah kontraktor, dimana terdapat pekerja lapangan ikut berperan penting dalam tercapainya kesuksesan proyek untuk mendapatkan kebermanfaatan secara maksimal. Persepsi yang diharapkan adalah dari sisi pekerja lapangan proyek konstruksi untuk aspek keberlanjutan sosial. Persepsi pekerja lapangan sendiri mengenai sudut pandang harapan dan realita yang dirasakan oleh pekerja. Tujuan dari penelitian ini untuk membangun model penilaian keberlanjutan sosial pada pekerja lapangan proyek konstruksi. Pada penelitian ini membentuk model penilaian keberlanjutan sosial pekerja diaplikasikan pada proyek konstruksi. Untuk membangun model penilaian keberlanjutan sosial pekerja, penelitian ini menggunakan metode Analytical Hierarchy Process (AHP) dan Fuzzy Comprehensive Evaluation (FCE). Metode Analytical Hierarchy Process (AHP) digunakan untuk melakukan pembobotan pada kriteria keberlanjutan sosial. Dimana akan membentuk urutan bobot dari kriteria penilaian secara hierarki dan dapat mengetahui kriteria yang memiliki bobot terbesar. Metode Fuzzy Comprehensive Evaluation (FCE) melakukan evaluasi penilaian keberlanjutan sosial dari pekerja lapangan yang didapatkan melalui penilaian harapan dan realita yang dinilai oleh pekerja. Dengan pembobotan yang telah didapat mengunakan metode Analytical Hierarchy Process (AHP), hasil dari penilaian tersebut dapat mengakomodasi nilai keberlanjutan sosial pada pekerja lapangan secara keseluruhan, dengan membandingkan nilai harapan dan realita. Melalui model penilaian ini dapat melihat kriteria yang ingin dipenuhi untuk mencapai keberlanjutan sosial pada pekerja. Pada penerapannya hasil akhir dari model penilaian melalui studi kasus didapatkan nilai keberlanjutan sosial pada pekerja lapangan konstruksi sebesar 0.948. Sehingga nilai tersebut dapat dijadikan sebagai bahan evaluasi dalam meningkatkan keberlanjutan sosial pada pekerja lapangan
=========================================================================================================================================
The principle of sustainable development is to provide benefits in terms of economic, social and environmental aspects. Characteristics of social aspects of a project have a high degree of uncertainty. Involvement in implementation of social sustainability depends on interaction of each stakeholder. One of stakeholders involved is contractor, where there are field workers who play an important role in achieving project success to get maximum benefit. Expected perception is from side of construction project field workers in social sustainability aspect. Perception of field workers themselves regarding point of view of expectations and reality felt by workers. Purpose of this study is to build a model of social sustainability assessment for construction project field workers. In this study, a model for assessing social sustainability of workers is applied to construction projects. To build a model for assessing social sustainability of workers, this study uses Analytical Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation (FCE) methods. Analytical Hierarchy Process (AHP) method is used to weight social sustainability criteria. Where will form a sequence of weights from assessment criteria in a hierarchical manner and can find out which criteria have greatest weight. Fuzzy Comprehensive Evaluation (FCE) method evaluates social sustainability assessments from field workers obtained through an assessment of expectations and realities assessed by workers. With weighting that has been obtained using Analytical Hierarchy Process (AHP) method, results of assessment can accommodate social sustainability value of field workers as a whole, by comparing values of expectations and reality. Through this assessment model, it is possible to see criteria to be met to achieve social sustainability for workers. In the application of final result of assessment model through a case study, value of social sustainability for construction field workers is 0.948. So that this value can be used as an evaluation material in improving social sustainability for field workers
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RSS 625.7 Fir p-1 |
Uncontrolled Keywords: | AHP, FCE, Keberlanjutan Sosial, Pekerja Konstruksi, Penilaian |
Subjects: | H Social Sciences > HE Transportation and Communications > HE355.4 Toll roads |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis |
Depositing User: | EKO BUDI RAHARJO |
Date Deposited: | 20 Dec 2022 05:56 |
Last Modified: | 20 Dec 2022 05:56 |
URI: | http://repository.its.ac.id/id/eprint/95250 |
Actions (login required)
View Item |