Evaluasi Sistem Pelepasan Beban Pada Pt Pertamina Ru VI Balongan

Hidayat, Fuad Insan (2022) Evaluasi Sistem Pelepasan Beban Pada Pt Pertamina Ru VI Balongan. Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 07111840000186-Undergraduate_Thesis.pdf] Text
07111840000186-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2024.

Download (2MB)

Abstract

Sistem tenaga listrik merupakan sebuah jaringan interkoneksi yang berfungsi untuk mendistribusikan listrik dari pembangkit ke pengguna. PT Pertamina (Persero) merupakan badan usaha milik negara (BUMN) dalam bidang pengolahan dan penambangan minyak dan gas bumi di Indonesia. PT Pertamina (Persero) Refenery unit (RU) VI Balongan adalah kilang keenam dari Direktorat Pengolahan PT Pertamina (Persero) dengan menggunakan konfigurasi double busbar 20 kV. Pada pengoperasian unit menggunakan 5 STG (Steam Turbine Generator) dengan setiap unit berkapasitas 22 MW dan total beban sebesar 84 MW. Pada saat ini daya harus selalu terjaga dari berbagai macam gangguan. Hal ini disebabkan oleh pasokan daya yang berkurang secara tiba-tiba pada suatu system yang akan mempengaruhi stabilitas dari sistem tersebut. Mekanisme pelepasan beban dituntut untuk cepat karena merupakan langkah terakhir yang yang digunakan untuk menyelamatkan sistem pada saat terjadi gangguan. Gangguan yang dibiarkan terlalu lama akan mengakibatkan black-out atau padam total pada sistem
========================================================================================================================================
The electric power system is an interconnected network that functions to distribute electricity from generators to users. PT Pertamina (Persero) is a state-owned enterprise (BUMN) in the field of oil and gas processing and mining in Indonesia. PT Pertamina (Persero) Refenery Unit (RU) VI Balongan is a refinery of the Directorate of Processing of PT Pertamina (Persero) using a 20 kV double busbar configuration. In the operation of the unit using 5 STG (Steam Turbine Generator) with a load of each unit with a capacity of 22 MW and a total of 84 MW. At this time the power must always be maintained from various kinds of interference. This is caused by a sudden decrease in power supply in a system which will affect the system. determining the workload to quickly is the last step used to save the system in the event of a breakdown. Disturbances that are left too long will result in blackouts or total blackouts on the system

Item Type: Thesis (Other)
Additional Information: RSE 621.31 Ins e-1
Uncontrolled Keywords: Transient Stability, Load Shedding, UFR, Generator
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems
Divisions: Faculty of Electrical Technology > Computer Engineering > 90243-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 20 Dec 2022 07:52
Last Modified: 20 Dec 2022 07:52
URI: http://repository.its.ac.id/id/eprint/95253

Actions (login required)

View Item View Item