Perencanaan Pengembangan Pengolahan Sampah Organik Menggunakan Black Soldier Fly (Bsf) Di Tps 3r Sawunggaling, Kecamatan Trenggalek, Kabupaten Trenggalek

Pangestu, Aditya Kurnia Aji (2022) Perencanaan Pengembangan Pengolahan Sampah Organik Menggunakan Black Soldier Fly (Bsf) Di Tps 3r Sawunggaling, Kecamatan Trenggalek, Kabupaten Trenggalek. Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 03211840000037-Undergraduate_Thesis.pdf] Text
03211840000037-Undergraduate_Thesis.pdf - Accepted Version

Download (6MB)

Abstract

Pertumbuhan penduduk Kabupaten Trenggalek, tidak terkecuali Kecamatan Trenggalek, berdampak pada peningkatan timbulan sampah yang dihasilkan. Upaya reduksi yang telah dilakukan di Kecamatan Trenggalek adalah dengan penyelenggaraan TPS 3R Sawunggaling dengan luas 362,5 m2. Hanya 40% - 45% sampah masuk yang terkelola sedangkan 50% - 55% sisanya menjadi residu dan diangkut ke TPA sehingga perlu dilakukan pengembangan. Oleh karena itu, tujuan dari perencanaan pengembangan ini adalah (1) mengevaluasi kondisi eksisting pengelolaan sampah di TPS 3R Sawunggaling; (2) mengidentifikasi timbulan, densitas, dan komposisi sampah yang ada di TPS 3R Sawunggaling; dan (3) merencanakan pengembangan pengolahan sampah organik menggunakan BSF di TPS 3R Sawunggaling secara aspek teknis dan finansial. Kegiatan sampling dengan metode load-count analysis di TPS 3R Sawunggaling mendapatkan data timbulan sampah dan karakteristik sampah yang meliputi komposisi sampah dan densitas sampah. Selanjutnya, menentukan cakupan pelayanan TPS 3R Sawunggaling, menganalisis kesetimbangan massa, merencanakan penambahan fasilitas pengolahan sampah organik oleh Black Soldier Fly, dan menghitung kebutuhan tenaga kerja. Untuk aspek finansial, dilakukan perhitungan biaya investasi pengadaan fasilitas pengolahan BSF, biaya operasional dan pemeliharaan TPS 3R Sawunggaling, serta potensi pendapatan untuk menentukan kelayakan finansial dengan metode Net Present Value (NPV). Berdasarkan hasil evaluasi, pengelolaan sampah di TPS 3R Sawunggaling perlu peningkatan dalam hal pemilahan sampah di sumber, penambahan jadwal tetap dalam hal pengumpulan sampah, dan peningkatan produksi kompos. Timbulan sampah TPS 3R Sawunggaling mencapai 0,67 kg/orang.hari dan densitas sampah sebesar 204,91 kg/m3. Komposisi sampah didominasi oleh sampah organik sebesar 83,7% dan 16,3% sisanya merupakan sampah anorganik. Dengan memanfaatkan potensi sampah organik yang masuk ke TPS 3R Sawunggaling, maka direncanakan pengembangan pengolahan sampah organik dengan menambahkan metode pengomposan menggunakan larva BSF. Pada tahun perencanaan, TPS 3R Sawunggaling melayani 1.268 jiwa dengan timbulan sampah sebesar 864,34 kg/hari. Melalui perencanaan ini, residu TPS 3R Sawunggaling berkurang dari 57,9% menjadi 24,6% sehingga mengurangi timbulan sampah yang diangkut menuju Tempat Pemrosesan Akhir (TPA). Dalam pengelolaan fasilitas ini, TPS 3R Sawunggaling membutuhkan biaya investasi sebesar Rp. 34.271.157,60, biaya operasional sebesar Rp. 217.601.983,80/tahun, dan akan menghasilkan potensi pendapatan sebesar Rp. 434.747.586,62/tahun. Dari biaya tersebut diperoleh nilai NPV positif yang berarti perencanaan pengembangan layak secara finansial
=======================================================================================================================================
The population growth of Trenggalek Regency, including Trenggalek District, has an impact on increasing the amount of waste generated. The reduction effort that has been carried out in Trenggalek District is by holding the 3R Sawunggaling TPS with an area of 362.5 m2. Only 40% - 45% of incoming waste is managed, while the remaining 50% - 55% becomes residue and is transported to the landfill, so development is necessary. Therefore, the objectives of this development plan are (1) to evaluate the existing condition of waste management at TPS 3R Sawunggaling; (2) identify the generation, density, and composition of waste in TPS 3R Sawunggaling; and (3) planning the development of organic waste processing using BSF at TPS 3R Sawunggaling from a technical and financial perspective. Sampling activities using the load-count analysis method at TPS 3R Sawunggaling obtained data on waste generation and waste characteristics which included waste composition and waste density. Next, determine the scope of TPS 3R Sawunggaling services, analyze the mass balance, plan for additional organic waste processing facilities by Black Soldier Fly, and calculate labor requirements. For the financial aspect, the calculation of investment costs for the procurement of BSF processing facilities, operational and maintenance costs for TPS 3R Sawunggaling, as well as potential income is carried out to determine financial feasibility using the Net Present Value (NPV) method. Based on the results of the evaluation, waste management at TPS 3R Sawunggaling needs improvement in terms of segregating waste at source, adding a fixed schedule in terms of waste collection, and increasing compost production. Waste generation from TPS 3R Sawunggaling reaches 0.67 kg/person.day and the density of waste is 204.91 kg/m3. The waste composition is dominated by organic waste by 83.7% and the remaining 16.3% is inorganic waste. By exploiting the potential for organic waste to enter TPS 3R Sawunggaling, it is planned to develop organic waste processing by adding a composting method using BSF larvae. In the planning year, TPS 3R Sawunggaling served 1,268 people with a waste generation of 864.34 kg/day. Through this plan, the residue of TPS 3R Sawunggaling is reduced from 57.9% to 24.6%. thus reducing the generation of waste that is transported to the Final Processing Site (TPA). In managing this facility, TPS 3R Sawunggaling requires an investment cost of Rp. 34,271,157.60, operational costs of Rp. 217,601,983.80/year, and will generate a potential income of Rp. 434,747,586.62/year. From these costs, a positive NPV value is obtained, which means that the development plan is financially feasible

Item Type: Thesis (Other)
Additional Information: RSL 628.445 Pan p-1
Uncontrolled Keywords: Black Soldier Fly, Pengembangan, Pengolahan, Sampah Organik, TPS 3R
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD789 Refuse and refuse disposal
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 11 Jan 2023 01:13
Last Modified: 21 Nov 2024 06:59
URI: http://repository.its.ac.id/id/eprint/95360

Actions (login required)

View Item View Item