Modifikasi Perencanaan Struktrur Jembatan Sukorame Kabupaten Trenggalek Dengan Beton Pra Tekan Statis Tak Tentu

Rachmat Indra F., - (2007) Modifikasi Perencanaan Struktrur Jembatan Sukorame Kabupaten Trenggalek Dengan Beton Pra Tekan Statis Tak Tentu. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3104109632.pdf] Text
3104109632.pdf - Accepted Version

Download (70MB)

Abstract

Pembangunan Jembatan Sukorame merupakan bagian pelaksanaan pembangunan jalan lintas selatan yang dilakukan oleh Dinas Pekerjaan Umum Bina Marga Daerah Propinsi Tingkat I Jawa Timur. Jembatan Sukorame ini terletak di perbatasan Kabupaten Trenggalek dan Kabupaten Tulunggagung. Hal ini dimaksudkan untuk memberikan aksebilitas pemanfaatan potensi secara optimal dalam upaya pengembangan wilayah serta menunjang sektor-sektor lain seperti sumber daya alam dan
pariwisata. Dalam perencanaan jembatan beton pratekan terdapat dua klasifikasi yaitu balok menerus (continuous beam) dan balok sederhana (simple beam). Untuk memenuhi aspek-aspek penting dari suatu perencanaan dipilih alternatif struktur beton pratekan balok menerus (statis tak tentu), dimana elemen-elemen balok beton pratekan (simple beam) dapat dibuat menerus dengcm cara menempatkan baja prategang diatas tumpuan yang juga dapat dikenal continuous beam. Dalam penulisan tugas akhir ini akan dibuat perencanaan struktur atas jembatan dengan menggunakan balok beton pratekan standard AASHTO tipe V dengan bentang 29 meter. Sistem statika pada perencanaan jembatan ini termasuk statis tak tentu, dengan membuat plat lantai kendaraan secara menerus untuk beban hidup lalu lintas, yang komposit dengan balok beton pratekan. Perencanaan jembatan Sukorame ini mempunyai prosedur perhitungan yang bertahap. Secara garis besar tahapan-tahapan dalam perencanaan yaitu : pencarian data-data, menentukan alternatif dimensi gelagar utama yang dilanjutkan dengan perhitungan kekuatan struktur
beserta kontrolnya. Dalam perhitungan perencanaan elemen-elemen jembatan ini tidak lepas dari tuntutan struktural yang harus dipetruhi dengan mengacu pada peraturan yang berlaku di Indonesia yaitu “Peraturan Perencanaan Teknik Jembatan * f (Bridge Management System 1992). Hasil- hasil yang diperoleh dari perencanaan dan perhitungan diaplikasikan dalam bentuk gambar teknis.
==================================================================================================================================
Development of Sukorame bridge represent part of south way roads development project execution by On duty Public Work Construct Clan the first Area Mount East Java Province. The Sukoramen bridge located in Trenggalek regency and Tulunggagung Regency. This Matter intended to give the accessibility of potency exploiting in an optimal fashion in the effort regional development and also support the other; dissimilar sector like experienced resource and tourism. In the prestress concrete bridge plan there are two classi-fication; the continuous beam and simple beam. To filfilling important aspects in the planning selected structure alternative by prestress concrete continuous beam (indefinite static), where elements of prestress concrete beam (simple beam) can be made continuous by placing prestress steel above middle restraints which recognizable also continuous beam. In this final project writing, will be made the super structure bridge planning by using prestress concrete beam 5th type of AASHTO's standards for 29 meter of span. The bridge planning statics system inclusive in indefinite static, by making continuous slab for vehicles live load which is composite to prestress concrete beam. This Sukorame bridge planning have the calculation procedure which in phases. Marginally step in the plan that is : data seeking, determining main beam profile dimension alternative continued to calculation of structure strength therewith its control. In calculation of this bridge elements planning is unreleasing of the structural demand which must chockablock relate regulation going into effect in Indonesia that is " Regulation of Bridge Planning Technique" ( Bridge Management System 1992). As the result of the planning and calculation apllied in technical draws.

Item Type: Thesis (Other)
Additional Information: RSS 624.2 Riz m-1 2007
Uncontrolled Keywords: beton pratekan, balok menerus
Subjects: T Technology > TG Bridge engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: agus setiawan
Date Deposited: 13 Jan 2023 08:42
Last Modified: 16 Jan 2023 02:42
URI: http://repository.its.ac.id/id/eprint/95386

Actions (login required)

View Item View Item