Analisis Penjadwalan Proyek Onshore Storage LNG Terminal Jawa Timur PT. X

Ahmad, Mirza Adisa (2023) Analisis Penjadwalan Proyek Onshore Storage LNG Terminal Jawa Timur PT. X. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311940000111_Undergraduate_Thesis.pdf] Text
04311940000111_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (8MB) | Request a copy

Abstract

Dalam sebuah kegiatan pekerjaan proyek, manajemen penjadwalan proyek menjadi salah satu faktor penting yang dapat menentukan keberhasilan dari suatu proyek. Perencanaan dan penjadwalan yang baik dari suatu proyek menentukan keberhasilan tahapan proyek berikutnya. Maka dari itu diperlukan perencanaan serta penjadwalan yang baik agar proyek tersebut berjalan dengan lancar sesuai dengan yang direncanakan. Tujuan dari penelitian ini adalah untuk mengetahui S-curve rencana proyek, durasi proyek, serta total estimasi biaya proyek dengan menggunakan metode Critical Path Method (CPM) dan S-Curve. Proyek yang digunakan pada analisis penelitian ini yaitu Proyek Onshore Storage LNG Terminal Jawa Timur PT.X. Tahapan yang diteliti dalam analisis penjadwalan ini adalah tahap konstruksi. Analisis penjadwalan S-Curve dilakukan menggunakan software Ms. Excel. Sedangkan Analisis CPM dilakukan menggunakan perhitungan manual, dan juga software Ms. Project. Dari hasil penelitian serta analisis data yang telah dilakukan menggunakan metode S-Curve didapatkan rencana presentase progress proyek setiap bulan, dan S-curve rencana Proyek Onshore Storage LNG Terminal. S-Curve rencana proyek yang dihasilkan merupakan Back-Loaded S-Curve, menunjukkan sebuah proyek tersebut memiliki perencanaan yang baik dan matang. Kemudian untuk hasil analisis menggunakan metode CPM, didapatkan bahwa proyek dapat diselesaikan dalam 422 hari. Diperoleh juga sebelas lintasan kritis, yakni aktivitas dengan ID: B-P-Q-S-T-W-X-AP-AQ-AR-BA. Kemudian dari analisis biaya didapatkan hasil biaya total estimasi proyek sebesar Rp 108.430.795.093. Dengan demikian penjadwalan proyek menggunakan metode CPM, dan S-Curve dapat menghasilkan perencanaan penjadwalan yang lengkap mulai dari rencana presentase progress setiap bulan, estimasi waktu penyelesian dan juga estimasi biaya proyek. ==============================================================================================================================
In a project work activity, project scheduling management is one of the important factors that can determine the success of a project. Good planning and scheduling of a project determines the success of the next stage of the project. Therefore, good planning and scheduling are needed so that the project runs smoothly as planned. The purpose of this study is to determine the S-curve of the project plan, project duration, and the total estimated project cost using the Critical Path Method (CPM) and S-Curve methods. The project used in this research analysis is the East Java Terminal LNG Onshore Storage Project PT.X. The stage studied in this scheduling analysis is the construction stage. S-Curve scheduling analysis was performed using Ms. Excel software. Meanwhile, CPM analysis is carried out using manual calculations, and also Ms. Project software. From the results of research and data analysis that has been carried out using the S-Curve method, a percentage plan of project progress is obtained every month, and the S-curve plan of the Onshore Storage LNG Terminal Project. The resulting S-Curve project plan is a Back-Loaded S-Curve, shows that a project has good and careful planning. Then for the results of the analysis using the CPM method, it was found that the project could be completed in 422 days. Also obtained were eleven critical trajectories, namely activity with the ID: B-P-Q-S-T-W-X-AP-AQ-AR-BA. Then from the cost analysis, the results of the total cost of the project estimate were obtained at Rp 108,430,795,093. Thus project scheduling uses the CPM method, and S-Curve can produce a complete scheduling plan starting from the monthly progress percentage plan, estimated completion time and also project cost estimation.

Item Type: Thesis (Other)
Uncontrolled Keywords: Penjadwalan, CPM, S-Curve, Onshore Storage LNG, Project Schedulling
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Mirza Adisa Ahmad
Date Deposited: 18 Jan 2023 05:49
Last Modified: 18 Jan 2023 05:49
URI: http://repository.its.ac.id/id/eprint/95462

Actions (login required)

View Item View Item