Penentuan Skema Pembelian Heavy Equipment Menggunakan Simulasi Monte Carlo Dengan Mempertimbangkan Fluktuasi Kebutuhan Bongkar Muat Kargo (Studi kasus operasional Pelabuhan Solid PT XYZ)

., Subali (2023) Penentuan Skema Pembelian Heavy Equipment Menggunakan Simulasi Monte Carlo Dengan Mempertimbangkan Fluktuasi Kebutuhan Bongkar Muat Kargo (Studi kasus operasional Pelabuhan Solid PT XYZ). Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032211155-Master_Tesis.pdf] Text
6032211155-Master_Tesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (7MB) | Request a copy

Abstract

Dalam rangka meningkatkan keunggulan bersaing dari perusahaan secara berkelanjutan, perusahaan perlu melakukan improvement dan pengembangan di bidang usahanya. Dalam melakukan pengembangan usaha diperlukan investasi yang efektif dan efisien dalam perolehan asset-asset produktif perusahaan. Untuk memenuhi kebutuhan permintaan pasar yang besar dari global market, dibutuhkan kapasitas angkut dengan volume besar, dengan menggunakan kapal laut untuk kegiatan eksport dan import antar pulau atau lintas negara dengan muatan volume kapal yang maksimal sesuai dengan desain dermaga DUKS (Dermaga Untuk Kepentingan Sendiri) dan fasilitas heavy equipment yang ada di dermaga untuk kegiatan bongkar muat row material maupun hasil produksi. Berdasarkan data PT. XYZ tahun 2021 masih terdapat gap biaya yang besar antara heavy equipment asset milik sendiri (42%) dibandingkan dengan sewa (58%), untuk excavator biaya sewa eksternal mencapai 86% dari total sewa eksternal, sedangkan untuk wheel loader biaya sewa eksternal mencapai 14% dari total sewa eksternal. Dengan kondisi kebutuhan heavy equipment ini perlu di teliti berapa unit asset yang perlu di beli dan berapa unit alat yang perlu disewa ke pihak eksternal. Kebutuhan alat berat ini juga tergantung kepada jadwal sandar kapal yang fluktuatif, sehingga metode yang di gunakan untuk memprediksi kebutuhan heavy equipment pada tahun yang akan datang dipilih menggunakan simulasi Monte Carlo. Semua biaya terkait biaya investasi (initial cost) biaya perawatan, biaya overhaul, biaya spare-part, dan biaya jasa service, merupakan hal yang penting untuk dipertimbangkan dalam investasi asset heavy equipment untuk di simulasikan. Hasil Analisis diperoleh bahwa keputusan yang harus diambil oleh perusahaan dalam pemenuhan kebutuhan heavy equipment di pelabuhan cargo padat, yang dapat memberi manfaat lebih besar bagi perusahaan, yaitu membeli tambahan 2 unit HE Excavator sehingga jumlah asset tetap menjadi 4 unit. Namun untuk wheel loader tidak perlu membeli tambahan asset lagi karena sudah cukup 2unit saja, sesuai dengan hasil simulasi Monte Carlo. Untuk kebutuhan alat berat diluar asset tetap maka skema yang dilakukan adalah menyewa HE dari vendor eksternal. Dengan penambahan asset tetap ini diprediksi perusahaan akan memperoleh saving cost sebesar Rp3.030.970.000,00/pertahun. Hasil analisis investasi menghasilkan nilai NPV yang positip>0 yaitu Rp3.406.760.000,00 sehingga sangat layak untuk dilakukan investasi dengan penambahan pembelian asset tetap 2 unit excavator.
==============================================================================================================================
In order to increase the competitive advantage of the company in a sustainable manner, companies need to make improvements and developments in their business fields. In carrying out business development, of course, an effective and efficient investment is needed in the acquisition of the company's productive assets. To meet the needs of the large demand from the global market, a large volume of transportation capacity is needed, using ships for inter-island or cross-country export and import activities with a maximum volume of shiploads in accordance with the DUKS dock design (Jetty for Own Interests) and facilities heavy equipment on the dock for loading and unloading of row material and production. In 2021 base on data PT XYZ, there is still a large gap between own heavy equipment assets (42%) compared to rentals (58%), for excavators external rental costs reach 86% of total external rentals, while for wheel loaders external rental costs reach 14%. of the total external rent. With the condition of the need for heavy equipment, it is necessary to examine how many units of assets need to be purchased and how many units of equipment need to be rented. The need for this heavy equipment also depends on the fluctuating docking schedule, so the methodology used to predict demand in the coming year is chosen using a Monte Carlo simulation. All costs related to investment costs (initial costs), maintenance costs, overhaul costs, spare-part costs, service costs and depreciation, are important things to consider in investing in heavy equipment assets to be simulated. The results of the analysis obtained are to find out the decisions that must be taken by the company in meeting the needs of heavy equipment at solid cargo ports, which can provide greater benefits for the company, namely buying an additional 2 units of HE Excavators so that the total assets 4 units. However, for the HE wheel loader, there is no need to buy additional assets because only 2 units are enough, according to the results of the Monte Carlo simulation. For heavy equipment needs other than fixed assets, the scheme used is to rent HE from an external vendor. With the addition of fixed assets, it is predicted that the company will save a cost of Rp. 3,030,970,000.00/year. The results of the investment analysis yield a positive NPV > 0, namely Rp. 3,406,760,000.00, so it is very feasible to invest with the addition of purchasing fixed assets of 2 units of excavators.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Investment Analysis, Heavy equipment, Purchase Schemes, Monte Carlo
Subjects: H Social Sciences > HG Finance > HG4529 Investment analysis
H Social Sciences > HG Finance > HG4910 Investments
T Technology > T Technology (General)
T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.62 Simulation
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Subali .
Date Deposited: 23 Jan 2023 13:02
Last Modified: 23 Jan 2023 13:02
URI: http://repository.its.ac.id/id/eprint/95552

Actions (login required)

View Item View Item