Analisis Penjadwalan Proyek Docking Kapal Tunda Anggada X

Mahardika, Achmad Rafil (2023) Analisis Penjadwalan Proyek Docking Kapal Tunda Anggada X. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311940000071-Undergraduate_Thesis.pdf] Text
04311940000071-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (6MB) | Request a copy

Abstract

Dalam proyek docking kapal Tunda Anggada X dibutuhkan penjadwalan yang baik agar dalam proses berjalannya proyek dapat berjalan dengan lancar. Dalam merancang penjadwalan proyek, metode yang paling sering digunakan adalah Critical Path Method dan Critical Chain Project Management. Penelitiaan ini bertujuan untuk mengetahui perbandingan hasil penjadwalan antara metode tradisional CPM dengan metode CCPM. Proyek yang digunakan dalam analisa penelitian ini yaitu proyek docking kapal Tunda Anggada X. Metode yang digunakan untuk mencari besarnya buffer adalah metode Root Square Error Method (RSEM). Dalam analisis penjadwalan dilakukan perhitungan secara manual dan dengan bantuan software Primavera P6 sebagai validasi perhitungan total float, jalur kritis serta project network. Penjadwalan proyek menggunakan Critical Path Method (CPM) diketahui dapat selesai selama 31 hari. Sedangkan untuk CCPM proyek dapat selesai selama 24 hari ditambah dengan metode perhitungan buffer RSEM sebesar 3 hari dan total penjadwalan dengan CCPM menghasilkan durasi sebesar 27 hari. Dari analisis tersebut dapat disimpulkan bahwa metode tradisional CPM menghasilkan estimasi durasi yang lebih besar dibandingkan dengan CCPM dengan buffer sizing RSEM. Karena durasi yang diperoleh dengan Metode CPM lebih besar maka total biaya tenaga kerja yang dihasilkan lebih besar yaitu Rp 114.316.000,00 sedangkan metode CCPM adalah Rp 108.890.000,00. Pada perhitungan dengan metode CCPM terdapat pengurangan durasi safety time maka dilakukan evaluasi untuk mengetahui probabilitas keberhasilan dengan metode PERT. Diperoleh presentase sebesar 89,44% pada penjadwalan dengan metode CCPM.
==============================================================================================================================
In the Anggada X tugboat docking project, good scheduling is needed so that the project can run smoothly during the ongoing process. In designing project scheduling, the method most often used is Critical Path Method and Critical Chain Project Management. This study aims to determine the comparison of scheduling results between the traditional CPM method and the CCPM method. The project used in this research analysis is the Anggada X tug boat docking project. The method used to find the size of the buffer is the Root Square Error Method (RSEM). In the scheduling analysis, calculations are carried out manually and with the help of Primavera P6 software as a validation for calculating the total float, critical path and project network. Project scheduling using the Critical Path Method (CPM) is known to be completed in 31 days. Whereas for the CCPM the project can be completed in 24 days plus the RSEM buffer calculation method of 3 days and the total scheduling with CCPM produces a duration of 27 days. From this analysis it can be concluded that the traditional CPM method produces a larger estimated duration compared to CCPM with RSEM sizing buffer. Because the duration obtained by the CPM method is larger, the total labor cost produced is larger, namely IDR 114,316,000.00 while the CCPM method is IDR 108,890,000.00. In calculations with the CCPM method there is a reduction in the duration of safety time, so an evaluation is carried out to determine the probability of success with the PERT method. Obtained a percentage of 89.44% in scheduling with the CCPM method.

Item Type: Thesis (Other)
Uncontrolled Keywords: Critical Path Method, Critical Chain Project Management, Program Evaluation Review Techniques, Ship Docking.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Achmad Rafil Mahardika
Date Deposited: 23 Jan 2023 14:27
Last Modified: 23 Jan 2023 14:27
URI: http://repository.its.ac.id/id/eprint/95557

Actions (login required)

View Item View Item