Laporan Kerja Praktek Paket 1 Proyek Konstruksi Jalan Utama (Main Road) Jalan Tol Serang–Panimbang Seksi 2

Fakhrizal, Muhammad Miftah and Ramdhani, Dzaky (2022) Laporan Kerja Praktek Paket 1 Proyek Konstruksi Jalan Utama (Main Road) Jalan Tol Serang–Panimbang Seksi 2. Project Report. [s.n], [s.l.]. (Unpublished)

[thumbnail of 03111940000010_03111940000139-Project_Report.pdf] Text
03111940000010_03111940000139-Project_Report.pdf - Accepted Version
Restricted to Repository staff only

Download (39MB) | Request a copy

Abstract

Pembangunan jalan tol Serang-Panimbang Seksi 2 yang membentang sepanjang 23.727 km dari Rangkasbitung hingga Cileles. Proyek milik PT. Wijaya Karya Serang Panimbang dilaksanakan oleh PT. Wijaya Karya (Persero) Tbk. Sebagai kontraktor utama dan diawasi oleh PT. Jaya CM – PT. Displan Consult – PT. Bina Karya (Persero) sebagai konsultan pengawas. Penulisan laporan ini hanya terbatas pada pengamatan pekerjaan struktur Overpass 39 pada STA 50+677. Pengamatan yang dilakukan meliputi pekerjaan bore pile, footing, kolom, pier head, stressing girder, hingga erection girder. Pengendalian waktu dilakukan menggunakan kurva S, laporan harian, dan mingguan. Sementara pengendalian mutu dilakukan menggunakan checklist dan diperiksa oleh konsultan, project manager dan stakeholder.
==============================================================================================================================
The construction of the Serang-Panimbang toll road Section 2 stretches 23,727 km from Rangkasbitung to Cileles. PT. Wijaya Karya Serang Panimbang carried out by PT. Wijaya Karya (Persero) Tbk. As the main contractor and supervised by PT. Jaya CM – PT. Displan Consult – PT. Bina Karya (Persero) as supervisory consultant. The writing of this report is limited to observing the work of the Overpass 39 structure at STA 50+677. Observations made include bore pile, footing, column, pier head, stressing girder, to erection girder. Time control is carried out using the S curve, daily, and weekly reports. While quality control is carried out using a checklist and checked by consultants, project managers and stakeholders.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Proyek Konstruksi Jalan Utama (Main Road) Jalan Tol Serang–Panimbang Seksi 2
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH1461 Concrete construction.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Muhammad Miftah Fakhrizal
Date Deposited: 30 Jan 2023 08:17
Last Modified: 30 Jan 2023 08:17
URI: http://repository.its.ac.id/id/eprint/95784