Suatnadji, Galih Priyonggo (2023) Evaluasi Peningkatan Efisiensi Energi Pada Spam Padalarang Perumda Air Minum Tirta Raharja Kabupaten Bandung. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
6014211041-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2025. Download (4MB) | Request a copy |
Abstract
Pelayanan Air Minum Kecamatan Padalarang Kabupaten Bandung diselenggarakan oleh Perumda Air Minum Tirta Raharja menggunakan kombinasi sistem perpompaan. Penggunaan sistem perpompaan mengakibatkan biaya energi di sistem penyediaan Air Minum Padalarang Perumda Air Minum Tirta Raharja Kabupaten Bandung (Rp. 1227,00/m3) lebih tinggi dibandingkan rata-rata nasional (Rp. 345,77/m3). Lokasi penelitian di sistem distribusi Padalarang dipilih karena operasional pompa pada sistem ini berjalan selama 24 jam langsung melayani pelanggan. pompa eksisting beroperasi mengikuti fluktuasi debit penggunaan pelanggan yang mengakibatkan penggunaan energi menjadi tidak efisiens. Penelitian ini menganalisis alternatif peningkatan efisiensi energi pada sistem perpompaan Pedalarang melalui skema optimalisasi jaringan produksi dan disitribusi dengan pemasangan Variable Speed Drive (VSD) pada pompa sumur dalam dan distribusi layanan. Pelaksanaan penelitian dilakukan dengan mengambil beberapa data diantaranya data aliran debit pompa sumur dalam, debit pompa distribusi, tekanan pada pipa transmisi, tekanan pada pipa distribusi, konsumsi energi pompa sumur dalam, tagihan rekening listrik SPAM Padalarang dan dimensi jaringan pipa transmisi unit produksi dan pipa distribusi unit distribusi SPAM Padalarang guna mengevaluasi kebutuhan volume reservoir untuk mencukupi kebutuhan volume air pelayanan distribusi dan penentuan elevasi elevated reservoir guna mencukupi tekanan minimum pada titik kritis pelayanan. Peluang penghematan energi untuk mendapatkan sistem yang lebih efisien sangat terbuka untuk diterapkan. Skema optimalisasi jaringan unit produksi dan distribusi (alternatif 1) berupa perencanaan elevated reservoir dan/atau pemasangan Variable Speed Drive (VSD) pada pompa sumur dalam DW2 dan pompa distribusi CR2 (alternatif 2) dapat mengurangi waktu kerja pompa dan beban kerja pompa yang lebih ringan, dikarenakan elevated reservoir dapat menggantikan sebagian waktu penggunaan operasional pompa distribusi dan pengaturan perputaran motor pompa yang bervariasi karena frekuensinya diatur oleh VSD. Pemasangan VSD berpengaruh pada penurunan tagihan energi listrik dari semula Rp. 49.395.413,00/bulan menjadi Rp 36.045.338,00/bulan. Penurunan pemakaian energi listrik di sistem distribusi SPAM Padalarang berkurang sebesar 27% atau sebesar Rp 13.350.075,00 setiap bulannya dan harga pokok produksi air turun menjadi Rp. 991,00/m3. Pemasangan VSD dan elevated reservoir berpengaruh pada penurunan tagihan energi listrik dari semula Rp. 49.395.413,00/bulan menjadi Rp 30.755.148,00/bulan. Penurunan pemakaian energi listrik di Sistem Distribusi SPAM Padalarang berkurang sebesar 37,74%. atau sebsar Rp 18.640.265,00 setiap bulannya dan harga pokok produksi air turun menjadi Rp. 845,00/m3. Biaya investasi yang diperlukan untuk penerapan alternatif 2 sebesar Rp 58,550.000,00 dengan asumsi umur pakai VSD selama 20 tahun, di dapatkan NPV pada tahun ke 20 sebesar Rp. 3.180.443.943,00 , Payback Periode terjadi pada tahun ke 1 bulan ke 8 dan BCR sebesar 1,72 dengan IRR sebesar 37,05% pada tahun ke 2. Analisa kelayakan finansial untuk penerapan dari alternatif 2 dikatakan memnuhi atau layak secara finansial dalam jangka waktu 20 tahun. Biaya investasi yang diperlukan untuk penerapan alternatif 1 dan alternatif 2 adalah sebesar Rp 3,058,550.000,00 dengan asumsi umur pakai VSD selama 20 tahun dan umur elevated reservoir selama 50 tahun di dapatkan NPV pada tahun ke 20 sebesar Rp. 334.132.949,00 , Payback Periode terjadi pada tahun ke 19 bulan ke 2 dan BCR sebesar 1,51 dengan IRR sebesar 10,92% . Analisa kelayakan finansial dari alternatif 1 dengan alternatif 2 dikatakan kurang memnuhi atau kurang layak secara finansial dalam jangka waktu 20 tahun
====================================================================================================================================
Drinking water services in Padalarang District, Bandung Regency are provided by Perumda Tirta Raharja Drinking Water using a combination of pumping systems. The use of a pumping system results in energy costs in the Padalarang Drinking Water supply system of Perumda Tirta Raharja Drinking Water, Bandung Regency (IDR 1227,00/m3) higher than the national average (IDR 345,77/m3). The research location in the Padalarang distribution system was chosen because the pump operation in this system runs 24 hours directly serving customers. Existing pumps operate according to fluctuations in customer use discharge which results in inefficient energy use. This study analyzes alternatives to increase energy efficiency in the Pedalarang pumping system through a production and distribution network optimization scheme by installing a Variable Speed Drive (VSD) in deep well pumps and service distribution. The research was carried out by taking some data including flow data of deep well pump discharge, distribution pump discharge, pressure on transmission pipes, pressure on distribution pipes, energy consumption of deep well pumps, electricity bills for Padalarang SPAM and dimensions of transmission pipelines for production units and distribution pipes. Padalarang SPAM distribution unit to evaluate reservoir volume requirements to meet distribution service water volume requirements and determine elevated reservoir elevations to meet minimum pressure at service critical points. Opportunities for energy saving to get a more efficient system are very open to be implemented. Production and distribution unit network optimization scheme (alternative 1) in the form of planning an elevated reservoir and/or installation of Variable Speed Drive (VSD) on DW2 deep well pumps and CR2 distribution pumps (alternative 2) can reduce pump working time and lighter pump workload , because the elevated reservoir can replace part of the operational usage time of distribution pumps and the varying rotation of pump motors because the frequency is regulated by the VSD. The installation of VSD has an effect on reducing electricity bills from the original Rp. 49,395,413.00/month to IDR 36,045,338.00/month. The decrease in the use of electrical energy in the Padalarang SPAM distribution system decreased by 27% or IDR 13,350,075.00 per month and the cost of producing water reduced to IDR 1227.00/m3. The installation of VSD and elevated reservoirs has an effect on reducing electricity bills from the original Rp. 49,395,413.00/month to IDR 30,755,148.00/month and the cost of producing water reduced to IDR 991.00/m3 . The decrease in the use of electrical energy in the Padalarang SPAM Distribution System decreased by 37.74%. or IDR 18,640,265.00 per month. The investment cost required for the implementation of alternative 2 is Rp. 58,550,000.00 assuming a 20-year VSD lifespan, the NPV in the 20th year is Rp. 3,180,443,943.00 Payback Period occurs in year 1 to month 8 and BCR is 1.72 with an IRR of 37.05% in year 2. The financial feasibility analysis for the implementation of alternative 2 is said to be compliant or financially feasible in the long term. 20 years time. The investment cost required for the implementation of alternative 1 and alternative 2 is IDR 3,058,550,000.00 assuming a 20-year lifespan of the VSD and an elevated reservoir of 50 years, the NPV in the 20th year is IDR 334,132,949.00 , the Payback Period occurs in the 19th year of the 2nd month and the BCR is 1.51 with an IRR of 10.92%. The financial feasibility analysis of alternative 1 with alternative 2 is said to be inadequate or not financially feasible within a period of 20 years
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | efisiensi energi, optimalisasi jaringan, VSD, SPAM Padalarang, PDAM Tirta Raharja,energy efficiency, network optimization, VSD, Padalarang SPAM, PDAM Tirta Raharja |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems |
Divisions: | Faculty of Civil Engineering and Planning > Environment Engineering > 25101-(S2) Master Thesis |
Depositing User: | Galih Priyonggo Suatmadji |
Date Deposited: | 30 Jan 2023 06:49 |
Last Modified: | 30 Jan 2023 06:49 |
URI: | http://repository.its.ac.id/id/eprint/95795 |
Actions (login required)
View Item |