Christianti, Avelyne and Pitaloka, Dita Pradina (2021) Laporan Kerja Praktik Proyek Bandara Internasional Dhoho Kediri. Project Report. [s.n], [s.l.]. (Unpublished)
Text
03111940000017_03111940000042-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (8MB) | Request a copy |
Abstract
Kerja Praktik merupakan salah satu mata kuliah wajib yang harus ditempuh oleh setiap mahasiswa untuk menyelesaikan studinya pada Departemen Teknik Sipil ITS Surabaya. Dengan adanya Kerja praktik, mahasiswa diharapkan dapat menambah wawasan tentang dunia kerja teknik sipil sekaligus mengaplikasikannya dalam bentuk nyata di lapangan. Sehubungan itu, dilakukan kerja praktik pada proyek pembangunan Bandara Internasional Dhoho Kediri. Proyek dengan kontraktor PT. Wijaya Karya Bangunan Gedung ini terbagi ke dalam tiga zona pembangunan. Kerja praktik ini dilaksanakan di bawah bimbingan engineer pembangunan zona tiga. Pekerjaan yang dilakukan antara lain analisis potensi masalah pada sambungan baja, penyusunan work method statement untuk pekerjaan lapisan jalan, slab on ground, struktur baja, dan marka jalan, pembuatan daftar pengujian material aspal, serta implementasi pengujian material beton dan pengujian tanah. Terdapat dua permasalahan pada proyek antara lain pemancangan pondasi dilakukan sebelum pemadatan tanah untuk slab dan pelaksanaan pekerjaan pada cuaca hujan. Penyelesaian dari permasalahan tersebut antara lain pemadatan tanah untuk konstruksi slab pada kasus tersebut dilakukan menggunakan alat pemadat tanah yang kecil seperti baby roller dan dilaksanakan perencanaan untuk mengantisipasi cuaca hujan seperti membuat drainase sementara pada pekerjaan proyek.
=================================================================================================================================
Practical Work (Kerja Praktik) is one of the compulsory subjects that must be taken by every student to complete the studies at the Department of Civil Engineering ITS Surabaya. With practical work, students are expected to be able to add insight into the world of civil engineering work as well as apply it in a real form in the field. Therefore practical work was carried out on the Dhoho Kediri International Airport project. This project with a contractor from PT. Wijaya Karya Gedung is divided into three development zones. This practical work is carried out under the guidance of a zone three construction engineer. The work carried out includes analyzing potential problems with steel joints, preparing work method statements for road paving, slab on ground, steel structures, and road markings, preparing asphalt material test lists, as well as implementing concrete material tests and soil tests. There were two problems in the project, including the foundation erection which was carried out before the soil compaction for the slab and the execution of the work in rainy weather. The solution to these problems includes soil compaction for slab construction in this case using a small soil compactor such as a baby roller and carrying out planning to anticipate rainy weather such as making temporary drainage during project work.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | pemetaan sambungan, subbase dan base-course Boulevard Road, CBase, AC-BC, dan AC-WC Boulevard Road, Slab On Ground (SOG) |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Avelyne Christianti |
Date Deposited: | 01 Feb 2023 03:38 |
Last Modified: | 01 Feb 2023 03:38 |
URI: | http://repository.its.ac.id/id/eprint/95903 |
Actions (login required)
View Item |