Analisis Potensi Pemanenan Air Hujan Dalam Area Perumahan Untuk Mereduksi Banjir Pada Perumahan Sutorejo, Surabaya

Kustyaningrum, Jagad Dhita (2023) Analisis Potensi Pemanenan Air Hujan Dalam Area Perumahan Untuk Mereduksi Banjir Pada Perumahan Sutorejo, Surabaya. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6012201049-Master_Thesis.pdf] Text
6012201049-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (6MB) | Request a copy

Abstract

Meningkatnya jumlah penduduk dari tahun ke tahun menyebabkan pelayanan air baku atau air bersih yang ada masih belum cukup terpenuhi dengan baik Meningkatnya penduduk juga menyebabkan pesatnya pembangunan yang terjadi, hal ini menyebabkan makin banyaknya tutupan lahan sehingga dapat menyebabkan genangan banjir. Salah satu hal yang dapat dilakukan untuk mengatasi genangan banjir tanpa merubah sistem drainase yang ada yaitu dengan cara pemanenan air hujan atau Rainwater Harvesting. Pemanenan air hujan (PAH) merupakan metode yang digunakan untuk mengumpulkan air hujan yang berasal dari atap bangunan, permukaan tanah, atau jalan dan dimanfaatkan sebagai salah satu sumber suplai air bersih. Analisis yang dilakukan yaitu menganalisis ketersediaan air, menentukan sistem penampungan air hujan, serta menganalisis efektivitas dari sistem PAH terhadap banjir. Hasil dari penelitian ini yaitu didapatkan ketersediaan air Perumahan Sutorejo ketika curah hujan maksimum terjadi pada tahun 2016 sebesar 9325,701 m3 dan ketika curah hujan minimum tahun 2018 sebesar 3781,976 m3. Kebutuhan air baku per orang yaitu 0,118 m3/org/hari, jika dalam satu rumah terdapat 4 orang maka kebutuhan air untuk satu bangunan rumah sebesar 0,471 m3/hari. Untuk sistem PAH dimana air hujan yang jatuh di atap akan dialirkan dari talang dan pipa yang kemudian masuk ke dalam tampungan berupa ground reservoir. Tampungan yang digunakan ada 3 skenario yaitu skenario 1 tampungan berkapasitas 8 m3 dengan masing-masing panjang, lebar, dan tinggi 2 m, lalu skenario 2 berkapasitas 3,375 m3 panjang, lebar, dan tinggi 1,5 m, dan skenario 3 berkapasitas 1 m3 panjang, lebar, dan tinggi 1 m. Efektivitas dari sitem PAH terhadap genangan banjir yaitu didapatkan sebesar 1,58% - 80,16%
=====================================================================================================================================
The increase in population from year to year has resulted in raw water services not being fulfilled properly. The increase in population also causes the rapid development that occurs, this causes more and more land cover so that it can cause flood inundation. One way that can be done to overcome flood inundation without changing the existing drainage system is through rainwater harvesting. Rainwater harvesting is a method used to collect rainwater from building roofs, ground surfaces, or roads and is used as a source of raw water supply. The analysis carried out analyzing water availability, designing rainwater storage, and analyzing the effectiveness of rainwater harvesting systems against flooding. The results of this study are that the largest water availability in Sutorejo Residential when the maximum rainfall occurs in 2016 of 9325,701 m3 and when the minimum rainfall occurs in 2018 of 3781,976 m3. The raw water requirement for one person is 0,118 m3/person/day, if there are 4 people in one house then the water requirement for one house building is 0,471 m3/day. For the design of a rainwater harvesting system, when rainwater falls on the roof it will flow from the gutters and pipes which then enter the reservoir in the form of a ground reservoir. The reservoir uses 3 scenarios, namely scenario 1 with a capacity of 8 m3 with a length, width, and height of 2 m each, then scenario 2 with a capacity of 3,375 m3 with a length, width, and height of 1,5 m each, and scenario 3 with a capacity of 1 m3, with a length, width, and height of 1 m each. The effectiveness of rainwater harvesting against flood inundation is 1,58% - 80,16%

Item Type: Thesis (Masters)
Uncontrolled Keywords: Drainase, Genangan Banjir, Pemanenan Air Hujan, Drainage, Flood Inundation, Rainwater Harvesting
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE215 Drainage
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: Jagad Dhita Kustyaningrum
Date Deposited: 08 Feb 2023 06:23
Last Modified: 08 Feb 2023 06:23
URI: http://repository.its.ac.id/id/eprint/96003

Actions (login required)

View Item View Item