Erviani, Raihana Nabilla Dhani (2023) Analisis Penjadwalan Proyek Pembangunan Gudang Marunda Menggunakan Simulasi Monte Carlo. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
03111940000103-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2025. Download (19MB) | Request a copy |
Abstract
Walaupun perencanaan sebuah proyek konstruksi telah dilakukan sedemikian rupa, dalam pelaksanaanya belum tentu berjalan sempurna sesuai yang diharapkan. Setiap proyek memiliki risiko dan ketidakpastian dalam pelaksanaanya, sehingga dapat menyebabkan adanya ketidaksesuaian dalam penyelesaian pekerjaan. Ketidaksesuaian tersebut dapat mengakibatkan keterlambatan waktu penyelesaian proyek. Agar hal ini tidak terjadi, dibutuhkan analisis penjadwalan yang ikut mempertimbangkan faktor ketidakpastian. Dibutuhkan metode penjadwalan yang mempertimbangkan potensi risiko dan ketidakpastian dalam pelaksanaanya, yaitu menganalisis menggunakan metode penjadwalan probabilistik, contohnya dengan menggunakan Simulasi Monte Carlo. Simulasi Monte Carlo adalah teknik yang menghitung dan mengiterasi, biaya atau jadwal proyek berkali-kali menggunakan nilai input yang dipilih secara acak dari distribusi probabilitas kemungkinan biaya atau waktu yang terjadi. Proyek konstruksi Gudang Marunda yang berlokasi di Kawasan Industri dan Pergudangan Marunda, Kabupaten Bekasi, memiliki risiko adanya keterlambatan dalam kegiatan pembangunanya yang akan mempengaruhi waktu penyelesaian proyek. Dengan menggunakan Simulasi Monte Carlo, diharapkan dapat mengetahui perbandingan antara penjadwalan deterministik dan probabilistik. Berdasarkan Simulasi Monte Carlo yang telah dilakukan, dapat ditarik kesimpulan bahwa ditemukan tiga kemungkinan durasi dalam proyek pembangunan Gudang Marunda. Durasi pertama dalah durasi pesimis dengan lama 107 hari dimana kemungkinan terjadinya sebesar94,87%. Selanjutnya adalah durasi optimis dimana akan memakan waktu selama 91 hari dengan persentase terjadinya sebesar 11,17%. Terakhir, durasi yang paling mungkin berdasarkan simulasi adalah selama 97 hari dengan persentase kemungkinan terjadi sebesar 51,9%. Hasil simulasi durasi probabilistik ini memiliki jumlah hari yang serupa dengan perencanaan durasi secara deterministik yang telah dilakukan pada proyek pembangunan Gudang Marunda. Perencanaan durasi secara deterministik yang telah dilakukan berjumlah 98 hari, yaitu memiliki perbedaan 1 hari dari perencanaan durasi paling mungkin secara probabilistik, dengan persentase kemungkinan terjadinya sejumlah 60,03%
=====================================================================================================================================
Even though the planning of a construction project has been carried out in such a way, the implementation may not necessarily run perfectly as expected. Each project has risks and uncertainties in its implementation, which can cause discrepancies in the completion of work. This discrepancy can result in delays in project completion time. To prevent this from happening, a scheduling analysis is needed that takes into account the uncertainty factor. A scheduling method is needed that takes into account the potential risks and uncertainties in its implementation, namely analyzing using probabilistic scheduling methods, for example using Monte Carlo Simulation. Monte Carlo simulation is a technique that calculates, and iterates over, the cost or schedule of a project, many times, using input values chosen at random from a probability distribution of the likely costs or time they occur. The Marunda Warehouse construction project, which is located in the Marunda Industrial and Warehousing Area, Bekasi Regency, has the risk of delays in construction activities which will affect the project completion time. By using Monte Carlo Simulation, it is expected to know the comparison between deterministic and probabilistic scheduling. Based on the Monte Carlo Simulation that has been carried out, it can be concluded that there are three possible durations in the Marunda Warehouse development project. The first duration is pessimistic duration with a length of 107 days where the probability of occurrence is 94.87%. Next is the optimistic duration which will take 91 days with an occurrence percentage of 11.17%. Lastly, the most likely duration based on the simulation is 97 days with a probability of 51.9%. Results This probabilistic duration simulation has a number of days similar to the deterministic duration planning that has been carried out in the Marunda Warehouse development project. The deterministic planning duration that has been carried out totals 98 days, which is 1 day different from the probabilistically most likely duration planning, with a probability of 60.03%
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Penjadwalan, Probabilitas, Simulasi Monte Carlo Monte Carlo Simulation, Probability, Scheduling |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | RAIHANA NABILLA DHANI ERVIANI |
Date Deposited: | 06 Feb 2023 01:09 |
Last Modified: | 06 Feb 2023 01:09 |
URI: | http://repository.its.ac.id/id/eprint/96195 |
Actions (login required)
View Item |