Analisis Pengendalian Spare Parts Di Perusahaan Perbaikan Alat Berat

Hutagalung, Sahala Tua Parulian (2023) Analisis Pengendalian Spare Parts Di Perusahaan Perbaikan Alat Berat. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032202203-Master_Thesis.pdf] Text
6032202203-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (1MB) | Request a copy

Abstract

Pengendalian spare parts dalam perusahaan perbaikan terutama pada suku cadang tidak sama dengan perusahaan manufaktur pada umumnya, perlu pendekatan tersendiri sesuai dengan masalah yang ada. Dalam pengamatan dan pengumpulan data awal, fenomena kehabisan stok terutama dalam kategori listrik dan instrumental sering terjadi dan secara signifikan mempengaruhi kegiatan pemeliharaan. Tujuan dari penelitian ini adalah dapat menentukan jumlah kuantitas pemesanan dan reorder point yang optimal serta memberikan rekomendasi perbaikan untuk mengurangi terjadinya stock out dan atau mengurangi biaya persediaan spare part. Pada penelitian ini dilakukan pemilihan spare part menggunakan metode ABC, kemudian data tersebut dilakukan perhitungan ADI-CV untuk menentukan matriks pola permintaan yang terjadi. Kebijakan metode periodic review (R,S) dipilih untuk menentukan jumlah kuantitas pemesanan, titik pemesanan ulang (ROP) dan total biaya persediaan. Dalam perhitungan pendekatan simulasi Monte Carlo tidak dapat digunakan untuk menganalisis kinerja persediaan, kemudian dalam penelitian ini menggunakan metode Croston untuk rekomendasi perbaikan persediaan. Hasil utama dari penelitian ini adalah untuk menentukan tindakan perbaikan untuk persediaan spare part dalam rangka mengurangi stock out dan atau biaya persediaan. Berdasarkan hasil perhitungan pengendalian persediaan spare part di perusahaan perbaikan alat berat dengan metode periodic review didapatkan hasil nilai service level yang lebih tinggi 50% dibandingkan kondisi eksisting. Dimana implikasi praktik bagi perusahaan salah satunya adalah penelitian ini dapat dipakai untuk memasukkan data klasifikasi spare parts (ABC) pada sistem enterprise resource planning (ERP) di perusahaan, mengurangi shortage sebanyak 33% hingga 65% pada spare part sehingga durasi perbaikan peralatan dapat dikurangi 65% dan juga dapat meningkatkan service level.
==============================================================================================================================
The control of spare parts in a repair company, especially spare parts, is not the same as that of a manufacturing company in general, it needs a separate approach according to the existing problems. In the initial observation and data collection, the phenomenon of out of stock, especially in the electrical and instrumental categories, often occurs and significantly affects maintenance activities. The purpose of this research is to be able to determine the optimal number of order quantities and reorder points and provide recommendations for improvements to reduce stock outs and/or reduce the cost of spare part inventory. In this study, the selection of spare parts was carried out using the ABC method, then the data was calculated by ADI-CV to determine the demand pattern matrix that occurred. The periodic review (R,S) method policy was chosen to determine the order quantity, reorder point (ROP) and total inventory cost. In calculating the Monte Carlo simulation approach cannot be used to analyze inventory performance, then in this study using the Croston method for recommendations for inventory improvement. The main result of this study is to determine corrective actions for spare part inventory in order to reduce stock out and or inventory costs. Based on the results of spare part inventory control calculations in heavy equipment repair companies using the periodic review method, the service level value is 50% higher than the existing condition. One of the practical implications for companies is that this research can be used to enter data on the classification of spare parts (ABC) in enterprise resource planning (ERP) systems in companies, reduce shortages of spare parts 33% up to 65% so that the duration of equipment repairs can be reduced 65% and service levels can also be increased.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Periodic review (R,S), Klasifikasi ABC, simulasi Monte Carlo, Metode Croston, Pengendalian persediaan spare parts, Service level, ABC classification, Monte Carlo simulation, Croston Methods, Inventory control of spare parts
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD55 Inventory control
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Sahala Tua Parulian Hutagalung
Date Deposited: 06 Feb 2023 02:26
Last Modified: 06 Feb 2023 02:26
URI: http://repository.its.ac.id/id/eprint/96276

Actions (login required)

View Item View Item