Perencanaan Penjadwalan Proyek Bangunan Boarding House Kuningan Jakarta Selatan Menggunakan Metode BIM 4D dengan Software Tekla Structures

Wirawan, Danang (2023) Perencanaan Penjadwalan Proyek Bangunan Boarding House Kuningan Jakarta Selatan Menggunakan Metode BIM 4D dengan Software Tekla Structures. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201040-Undergraduate_Thesis.pdf] Text
2035201040-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (90MB) | Request a copy

Abstract

Building Information Modeling (BIM) merupakan solusi teknologi digital seiring dengan kemajuan industri konstruksi dan peningkatan kompleksitas proyek. Melalui pemodelan BIM 4D, penjadwalan suatu proyek dapat tervisualisasi secara grafis sehingga stakeholder yang terlibat dapat lebih intuitif dalam memahami desain bangunan. Meski memiliki banyak keuntungan, tingkat pengimplementasian BIM 4D di Indonesia masih rendah. Salah satu faktor penghambat implementasi BIM adalah kurangnya sumber daya manusia yang memiliki kapabilitas dalam mengoperasikan aplikasi berbasis BIM. Penelitian ini bertujuan untuk mengaplikasikan BIM 4D pada gedung menggunakan Tekla Structures. Pada penelitian ini diperoleh hasil visualisasi penjadwalan berupa model 3D yang terintegrasi dengan jadwal proyek. Penelitian ini dilakukan untuk mengetahui hasil visualisasi BIM 4D mengguanakan software Tekla Structures pada proyek gedung Boarding House Kuningan Jakarta Selatan. Hasil yang diharapkan pada penulisan tugas akhir ini adalah mengoptimalisasi manajemen kerja, koordinasi mitra yang lebih baik, pemanfaatan sumber daya secara optimal, simulasi proyek
=======================================================================================================================================
Building Information Modeling (BIM) is a digital technology solution for the advancement of the construction industry and the increasing complexity of projects. The scheduling of a project can be graphically visualized using 4D BIM modeling, enabling the stakeholders involved to understand the building's design more intuitively. Despite its numerous advantages, the level of implementation of BIM 4D in Indonesia remains very low. One of the factors impeding BIM implementation is an acute shortage of human resources capable of running BIM-based applications. The purpose of this study is to utilize Tekla Structures to apply 4D BIM to buildings. The results of scheduling visualization were obtained in the form of a 3D model integrated with the project schedule in this study. This study was conducted to determine the results of the visualization of BIM 4D using Tekla Structures software in the Kuningan Boarding House building project in South Jakarta. The expected results in writing this final project are optimizing work management, better partner coordination, optimal utilization of resources, and project simulation

Item Type: Thesis (Other)
Uncontrolled Keywords: BIM 4D, Tekla Structures, Boarding House Kuningan Jakarta Selatan BIM 4D, Tekla Structures, Kuningan Boarding House South Jakarta
Subjects: T Technology > TH Building construction > TH438.13 Building information modeling.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Danang Wirawan
Date Deposited: 08 Feb 2023 07:07
Last Modified: 15 Feb 2023 07:40
URI: http://repository.its.ac.id/id/eprint/96440