Raharjo, Joko (2023) Analisis Implementasi Lean Principles Pada Pekerjaan Bekisting Di Proyek Konstruksi. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
6012202029-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 31 March 2025. Download (3MB) | Request a copy |
Abstract
Proyek konstruksi merupakan salah satu kunci dalam pembangunan suatu negara berkembang. Dalam proyek konstruksi, akan ditemui banyak kendala yang dapat mengganggu kinerja proyek itu sendiri, sehingga dapat menyebabkan tidak tercapainya target mutu, biaya, dan waktu. Bekisting merupakan salah satu item pekerjaan yang paling banyak menggunakan resource (sumber daya). Salah satu contoh yaitu pada penggunaan alat bantu seperti tower crane, penggunaan material yang boros, serta penggunaan tenaga kerja yang paling banyak diantara item yang lainnya. Belum lagi apabila dengan menggunakan sistem konvensional, ada banyak sekali rework atau pekerjaan perbaikan yang kita lakukan apabila hasilnya tidak memuaskan walaupun beton dan besi sudah sangat baik. Dalam perkembangannya, banyak perusahaan yang sudah mencoba menggunakan beberapa sistem bekisting yang berubah seiring dengan perkembangan teknologi dan perkembangan zaman. Salah satunya penggunaan bekisting semi sistem dan bekisting Aluminium (Aluminium Formwork/Alform). Penelitian ini akan mengimplementasikan lean principles pada pekerjaan bekisting Aluminium Formwork/Alform sebagai penerapan lean construction dan membandingkan dengan metode semi sistem. Penelitian ini bertujuan untuk membandingkan metode konstruksi pekerjaan Bekisting Alform dengan bekisting semi sistem pada proyek High Rise Building dari sisi biaya dan dampaknya dalam kaitannya dengan upaya pengurangan waste sesuai lean principle. Data primer diambil melalui Focus Group Discussion dengan tim proyek untuk menentukan item penerapan lean principles yang relevan. Sedangkan data sekunder dari proyek terkait pemasangan bekisting dengan metode semi sistem dan alform. Hasil akhir dari penelitian ini adalah perbandingan biaya dari masing-masing metode konstruksi serta pengurangan waste terhadap pekerjaan di lapangan. dimana, waste cost dari metode semi sistem bekisting yaitu sebesar Rp 326,262,783.60 dan waste cost pada bekisting alform sebesar Rp 55.921.257,82, sehingga menghasilkan lean saving sebesar Rp 270,337,692.48.
======================================================================================================================================
Construction project are one of the keys to the development of a developing country. In a construction project, there will be many obstacle that can interfere with the project itself, which can result in not achieving quality, cost and schedule (time targets). Formwork are one of the item works that uses the most resources. The example is the use of equipments such as tower cranes, the use of wasteful materials, as well as the use of labor among other items. Not to mention when using a conventional system, there is a lot of rework or repair work. Many companies have tried to use several formwork systems that have changed along with technological developments and the times. One of them is the use of semi-system formwork and aluminum formwork (Aluminum Formwork/Alform). This research will implement lean principles in Aluminum Formwork/Alform as an application of lean construction and compare it with the semi-system method. The purpose of this research was to compare the construction method of Alform works with semy-system formwork in the high rise building projects in terms of cost and impacts in relation to efforts to reduce waste as the implementation of lean principles. Primary data was collected through Focus Group Discussions with the project team to determine the relevant lean principles implementation items. While the secondary data from the project related to the installation of formwork using the semi-system and alform method. The end result of this research is a comparison of the costs of each construction method and the reduction of waste for work in the field. And waste cost from semy-system method are Rp 326,262,783.60 and waste cost from Alform Rp 55.921.257,82, resulting in a lean saving of Rp. 270,337,692.48.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Lean construction, Bekisting Alform, Efisiensi, Waste, Aluminium Formwork, Efficiency |
Subjects: | T Technology > TH Building construction |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis |
Depositing User: | Joko Raharjo |
Date Deposited: | 15 Feb 2023 02:15 |
Last Modified: | 16 Feb 2023 11:22 |
URI: | http://repository.its.ac.id/id/eprint/97325 |